Similar Projects
HVAC Replacement - Hilliard Branch
Bidding
Hilliard, OH 43026

Northland HS 25 Ton AC Replacement for AHU 14
Bidding
Columbus, OH 43229

North Residential HVAC Modifications Phase 1
Post-Bid
Less than $3,850,000 est. value
Columbus, OH 43210

Rhodes - Room 326 AHU
Post-Bid
Less than $2,198,155 est. value
Columbus, OH 43210

Renovation of HVAC Systems in Design-Build Delivery Model - Phase 6
Results
Less than $64,671 est. value
Columbus, OH 43085

2019/20 HVAC Improvements
Results
Dublin, OH 43017

Darby Woods HVAC Improvements
Post-Bid
Less than $1,716,000 est. value
Galloway, OH 43119

Fairwood Facility Unit 29 HVAC Replacement -650265-100103
Results
Less than $283,200 est. value
Columbus, OH 43215

HVAC Improvements and Upgrades
Post-Bid

Design-Build Services
Results
Columbus, OH 43211

Central Safety Building HVAC System Reno
Post-Bid
Columbus, OH

Lima - Reed HVAC Upgrade
Results
Less than $235,000 est. value
Columbus, OH 43210

CSCC Building Systems Upgrades - Nestor Boiler Replacements
Post-Bid
Less than $525,000 est. value
Columbus, OH 43215

Construction of the Westerville Service Garage HVAC Upgrade
Results
Less than $50,000 est. value
Westerville, OH

Replacement of Central Enrollment's 40 Ton Condensing Unit and Evaporator
Post-Bid
Columbus, OH 43211

Last Updated 01/09/2020 11:50 AM
Project Title

King Arts Complex HVAC Improvements 2019

Physical Address View project details and contacts
City, State (County) Columbus, OH 43205   (Franklin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work for which consists of One Prime Contract for Remove existing VAV system, associated ductwork, controls, and rooftop unit that serves the second floor classroom areas. All associated hot water piping will be removed as well. New unit ventilators will be provided for each classroom on the second floor. New ceiling fan coil units will be provided for various area. All hot water and chilled water piping will be removed throughout the building including the tunnels. All new hot water and chilled water will be provided throughout. Existing Air cooled chiller will be removed and replaced with a new 120 ton air cooled chiller Also associated general work and electrical work to be provided and other such work

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents