Similar Projects
Eighth Street Commercial Center
New Construction - 83,804 SF
Conception
$500,000 to $1,000,000 CJ est. value
Stockton, CA 95206

Davis Road Widening - WT26029 - City of Stockton
Infrastructure
Conception
$4,371,000 est. value
Stockton, CA 95214

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Tracy Assisted Living and Memory Care
New Construction, Infrastructure - 84,000 SF
Design
$22,500,000 CJ est. value
Tracy, CA 95376

O'Reilly Auto Parts (ST6) / Stockton
New Construction, Infrastructure - 7,022 SF
Bidding
$1,800,000 CJ est. value
Stockton, CA 95209

RFQ Contractor - Department of Veterans Affairs Palo Alto Health Care System, Livermore Phase A
New Construction, Infrastructure - 112,000 SF
Bidding
$250,000,000 CJ est. value
Stockton, CA 95202

Residence Inn by Marriott
New Construction - 68,000 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Lodi, CA 95240

A and E On-Call Roadway Construction,District 10
Infrastructure
Post-Bid
$6,425,530 to $10,441,487 est. value

Brennan Avenue Resurfacing
Infrastructure
Results
$1,140,000 to $1,395,000 est. value
Escalon, CA

South 99 Frontage Road (East) Resurfacing
Infrastructure
Results
$570,000 to $670,000 est. value
Stockton, CA

CNG Fueling Station
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Tracy, CA 95376

CNG Fueling Station
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Tracy, CA 95376

Pershing Avenue Roadway Crown Reduction - WT26036 - City of Stockton
Infrastructure
Conception
$2,000,000 est. value
Stockton, CA 95214

Operational Improvements
Infrastructure
Design
$17,836,000 est. value
Stockton, CA 95214

Install Sidewalk and Median Fencing Along Dr. Martin Luther King Jr. Boulevard
Infrastructure
Bidding
$450,000 CJ est. value
Stockton, CA 95205

Last Updated 10/27/2022 02:05 PM
Project Title

Tru by Hilton Hotel / Lodi

Physical Address View project details and contacts
City, State (County) Lodi, CA 95240   (San Joaquin County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $12,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 4-story, 38,660 square-foot, 79-room hotel. As of October 27, 2022, this project is seeking approvals from the city. An architect has been selected. No general contractor information has been disclosed. A firm timeline has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

4 Stories Above Grade, 38,660 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents