Similar Projects
Bland Tract Subdivision
New Construction, Infrastructure
Conception
$55,000,000 CJ est. value
Statesboro, GA 30461

Oakcrest Subdivision Sewer Extensions - WWD-32-C - City of Statesboro
Infrastructure
Conception
$1,500,000 CJ est. value
Statesboro, GA 30461

Veterans Memorial Parkway Multi-Residential Development
New Construction, Infrastructure
Design
$40,000,000 CJ est. value
Statesboro, GA 30458

Bryant Landing - Phase 1
Demolition, New Construction, Infrastructure, Renovation
Design
$10,000,000 CJ est. value
Statesboro, GA 30458

RFP Engineering - Max Lockwood Drive
Infrastructure
Bidding
$300,000 CJ est. value
Statesboro, GA 30458

RFP Engineering - Max Lockwood Drive
Infrastructure
Bidding
$300,000 CJ est. value
Statesboro, GA 30458

Weatherization Assistance
Renovation
Post-Bid
Statesboro, GA 30459

T32 - District 5 Routine Maintenance Services
Infrastructure
Post-Bid
Baconton, Evans, GA 30809

Hood Road Paving Project
Infrastructure
Results
Statesboro, GA 30458

Road Repairs
Infrastructure
Results
Statesboro, GA

S & S Railroad Bed Road Residential Subdivision
New Construction, Infrastructure
Pending Verification
$54,782,420 CJ est. value
Statesboro, GA 30458

S & S Railroad Bed Road Residential Subdivision
New Construction, Infrastructure
Pending Verification
$54,782,420 CJ est. value
Statesboro, GA 30458

Replace Water Main on West Main Street - WWD-14-W - City of Statesboro
Infrastructure
Conception
$500,000 CJ est. value
Statesboro, GA 30458

Bryant Landing - Phase 2
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Statesboro, GA 30458

RFP Engineering - Bulloch County Dirt Road Paving FY 23 Professional Design Services
Infrastructure
Bidding
$3,414,000 CJ est. value
Statesboro, GA 30458

Last Updated 02/27/2023 03:06 PM
Project Title

Cawana Road Subdivision

Physical Address View project details and contacts
City, State (County) Statesboro, GA 30461   (Bulloch County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Paving/Reconstruction, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $102,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of 209 attached single-family homes and 30 detached single-family homes on 64.93 acres. As of February 27, 2023, this was seeking approvals with Statesboro Planning Commission. The owner will likely act as the general contractor. Information regarding the selection of an architect has not been provided. A firm construction timeline has not been confirmed. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents