Similar Projects
PFAS Raw and Finished Water Main Project
Infrastructure
Bidding
$2,900,000 est. value
Dudley, MA

Flanders Road Water Main Replacement
Infrastructure
Bidding
$1,500,000 est. value
Westborough, MA 01580

Ductile Iron Pipe and Associated Fittings
Infrastructure
Post-Bid
$60,000 est. value
Spencer, MA 01562

Unidirectional Flushing of approximately 70 miles of the Towns Water Mains.
Infrastructure
Post-Bid
$310,000 est. value
Shrewsbury, MA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

New Water Main at NCCI Gardner
Results
Less than $1,000,000 est. value
Gardner, MA 01440

Gardner Transmission Main Replacement Project
Infrastructure
Bidding
$827,000 est. value
Gardner, MA

Replacement of the Existing Waterline
Infrastructure
Post-Bid
$704,150 est. value
Sturbridge, MA 01566

Water Main Replacement at MWCC Fitness Center
Results
$85,000 est. value
Gardner, MA 01440

Charlton Police Department Water Service Connection Project
Infrastructure
Bidding
$76,000 est. value
Charlton, MA 01507

Walnut Street Phase 2 and Canal Street Infrastructure Improvements Schedule A & B
Infrastructure
Post-Bid
$964,000 est. value
Athol, MA

Waterworks Supplies / DPWP
Term Contract
Results
Worcester, MA

New Water Main in and Around Newton Street
Infrastructure
Post-Bid
Southborough, MA 01772

Quabbin Aqueduct Shaft 2 Repairs
Results
Holden, MA

West Street Infrastructure Improvements Project
Infrastructure
Post-Bid
$3,400,000 est. value
Southbridge, MA 01550

Last Updated 04/27/2022 09:19 AM
Project Title

Central Street Water Main Improvements

Physical Address View project details and contacts
City, State (County) Brookfield, MA   (Worcester County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $558,255
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing all labor, tools, materials and equipment necessary for the installation of approximately 860-LF of 8-inch water main, 915-LF of 12-inch sewer main, water services, hydrants and trench patching of all trenches, including all appurtenances. Also included is all work associated with the repair of areas impacted by the work under this Contract, and traffic, both pedestrian and vehicular control measures.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents