Similar Projects
Arlington Central School Building Envelope Repairs - Town of Arlington
Renovation
Conception
$3,697,750 est. value
Arlington, MA 02476

Ottoson Middle School Roof Top EMS Upgrades - Town of Arlington
Renovation
Conception
$400,000 est. value
Arlington, MA 02476

Tyngsborough Middle School
Addition
Design
$81,000,000 est. value
Tyngsborough, MA 01879

Gymnasium Air Handling Unit Replacement at the Greater Lowell Technical High School - General Bid
Renovation
Bidding
$480,000 CJ est. value
Tyngsborough, MA 01879

Furnish and Install Photo Voltaic (PV) Solar Panels Atop the Roofs of the New High School and Middle School
Renovation
Sub-Bidding
$250,000,000 CJ est. value
Belmont, MA 02478

Kitchen Upgrades at Lincoln School
Renovation
Post-Bid
Lincoln, MA 01773

Four Classroom Modular Construction to be Added to the School Campus
New Construction
Post-Bid
Framingham, MA

Construction Management at Risk Services - Stoneham High School
Results
Less than $140,000,000 est. value
Stoneham, MA 02180

Waltham High School - Filed Sub Bids
New Construction - 414,854 SF
Results
$295,000,000 est. value
Waltham, MA 02452

Beaver Country Day School Pool Complex (Chestnut Hill)
New Construction, Renovation, Infrastructure
Construction
$1,000,000 CJ est. value
Newton, MA 02467

Belmont Middle and High School Building - Belmont Public School
Renovation
Pending Verification
$500,000 CJ est. value
Belmont, MA 02478

Bartlett Boiler Room Stair and Vault Replacement - 2023-14 - City of Lowell
Renovation
Conception
$350,000 CJ est. value
Lowell, MA 01854

Construction Manager at Risk for the Tyngsborough Middle School
New Construction
Post-Bid
Tyngsborough, MA

Wakefield Memorial High School Project Management Services
Renovation, Addition
Results
$100,000,000 to $200,000,000 est. value
Wakefield, MA 01880

Theatrical Dimming System Upgrade at Canton High
Renovation, Alteration
Post-Bid
$85,000 est. value
Sudbury, MA

Last Updated 10/18/2022 04:07 PM
Project Title

HVAC System - Burlington High School

Physical Address View project details and contacts
City, State (County) Burlington, MA 01803   (Middlesex County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not been identified. As of October 18, 2022, the project is in feasibility study. Further details regarding design and construction timelines have not been identified. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents