Similar Projects
WWTA Contract to Raise Existing Manhole Frames
Term Contract
Bidding
TN

South Chickamauga Creek 2 - 4 Interceptor Rehabilitation
Infrastructure
Bidding
Chattanooga, TN

East Ridge Basin 1-75 Collector Sewer Project
Post-Bid
Chattanooga, TN 37402

Lupton Drive Chronic SSO Elimination
Renovation
Post-Bid
Chattanooga, TN 37400

Amos Road Force Main Replacement
Results
Less than $834,825 est. value
Chattanooga, TN 37400

Manhole Components
Term Contract
Results
Less than $100,000 est. value
Chattanooga, TN

Air/Vacuum Relief Valve Service
Post-Bid
Chattanooga, TN 37405

East Ridge Sewer Basin 3C and 4B Rehabilitation
Results
Chattanooga, TN

Raise and Lower Manholes for TN State Paving Projects for WRD
Term Contract
Post-Bid
Chattanooga, TN

Sewer Pipe
Term Contract
Results
Chattanooga, TN 37402

Utility Service for East Ridge Splash Pad
Post-Bid
East Ridge, TN

Sanitary Sewer Cured In Place Pipe Lining (CIPP) Blanket Contract
Results
Less than $2,000,000 est. value
Chattanooga, TN 37402

Storm and Sanitary Sewer Revisions at Lupton City Mill
Results
Less than $598,589 est. value
Chattanooga, TN 37402

Sewer Video and Sonar Inspection Services
Results
Less than $765,000 est. value
Chattanooga, TN 37405

Force Main Replacement
Results
Collegedale, Ooltewah, TN 37363

Last Updated 12/01/2021 11:53 AM
Project Title

Lake Carolyn Sanitary Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) Chattanooga, TN   (Hamilton County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this Contract shall consist of performing all work required to construct complete, in place, and ready to operate the following: 1. Approximately 2,650 LF of 8-inch sewer rehabilitation by cured-in-place pipe method. 2. Approximately 15 manholes to be rehabilitated by spray lining. 3. Reinstatement of approximately 36 service connections by robotic pipe liner core, brush, and cured-in-place pipe lining. 4. Sewers require pre-installation and post-installation CCTV inspections. Lateral launch capabilities will be required. 5. All associated pavement restoration, landscaping, erosion and sedimentation control, traffic control, and appurtenances. The allotted time for construction is 90 calendar days

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents