Similar Projects
Replacement of Boilers at Borough Hall
Post-Bid
Tenafly, NJ 07670

High Efficiency Heating system Upgrades
Post-Bid
Elizabeth, NJ 07202

Steam Trap Replacement Project at Bergen New Bridge Medical Center
Results
Paramus, NJ 07652

Energy Savings Improvement Program
Results
Elizabeth, NJ 07208

On-Call Time And Materials Services - Boiler Service
Post-Bid
Oakland, NJ

Boiler Repairs and Cleaning Repairs
Results
$50 est. value
Linden, NJ 07036

Boiler Maintenance Services
Term Contract
Post-Bid
Cliffside Park, NJ

Servicing of Heating and Hot Water System at All Housing Authority Sites
Results
Elizabeth, NJ 07202

DHW Replacement at Highland View Apartments
Alteration
Post-Bid
Palisades Park, NJ 07650

Boiler Replacement at Charles Dewolf Middle School
Results
Old Tappan, NJ 07675

Boiler Valve Replacement
Alteration
Post-Bid
NJ

Boiler Cleaning Bid
Results
Bergenfield, NJ

Plumbing and Boiler Maintenance Services
Term Contract
Post-Bid
Edgewater, NJ

Boiler Burner Service Bid
Results
Bergenfield, NJ

2022 Mechanical Services
Term Contract
Post-Bid
Summit, NJ

Last Updated 01/20/2022 01:08 PM
Project Title

Boiler Replacement Projects at Calvin Coolidge School and George Washington School

Physical Address View project details and contacts
City, State (County) Edgewater, Hillside, NJ 07020 (Bergen, Union Counties)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Location #1 Calvin Coolidge School: a. Boiler Replacement: All mechanical, electrical, plumbing and structural work required to demolish and remove existing boilers, pumps, piping, existing electronic and pneumatic controls and electrical work as identified in the plans and specifications. All mechanical, electrical, plumbing and structural work required to furnish and install new boilers, pumps, boiler controls, piping, electrical and structural systems as required and identified in the plans and specifications. All material and equipment shall be supplied and installed by this contractor including setting and installing any shipped loose material associated with Vendor components. Subcontractor to furnish and install all manual valves, strainers, automatic air vents, coring, wall sleeves, protective chase, underground trenching, insulation, tanks, local instrumentation, regulators, reliefs and all pipe supports. Subcontractor shall include all required piping, ductwork, starters, controls, power and control wiring and appurtenances to provide a fully functioning system b. New Combined Heat and Power: All mechanical, electrical, plumbing and structural work required to furnish and install new 10 kW combined heat and power unit. Subcontractor shall furnish and install all hot water supply and return piping, glycol supply and return piping and natural gas piping and components for the complete mechanical system. All material and equipment shall be supplied and installed by this subcontractor including setting and installing any shipped loose material associated with Vendor components. Subcontractor to furnish and install all manual valves, strainers, automatic air vents, coring, wall sleeves, protective chase, underground trenching, insulation, tanks, local instrumentation, regulators, reliefs and all pipe supports. Subcontractor shall include all required piping, ductwork, starters, controls, power and control wiring and appurtenances to provide a fully functioning system Project Location #2 George Washington School: a. Boiler Replacement: All mechanical, electrical, plumbing and structural work required to demolish and remove existing boilers, pumps, piping, existing electronic and pneumatic and electrical work as identified in the plans and specifications. All mechanical, electrical, plumbing and structural work required to furnish and install new boilers, pumps, boiler controls, piping, electrical and structural systems as required and identified in the plans and specifications. All material and equipment shall be supplied and installed by this contractor including setting and installing any shipped loose material associated with Vendor components. Subcontractor to furnish and install all manual valves, strainers, automatic air vents, coring, wall sleeves, protective chase, underground trenching, insulation, tanks, local instrumentation, regulators, reliefs and all pipe supports. Subcontractor shall include all required piping, ductwork, starters, controls, power and control wiring and appurtenances to provide a fully functioning system

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents