Similar Projects
Speegleville Bridge Addition (Middle Bosque River) - City of Waco
Addition, Demolition, Infrastructure
Conception
$6,700,000 CJ est. value
Waco, TX 76712

Speegleville Bridge Addition (Middle Bosque River) - City of Waco
Addition, Demolition, Infrastructure
Conception
$6,700,000 CJ est. value
Waco, TX 76712

Black Rifle Coffee Company / Waco
New Construction - 2,722 SF
Design
$1,100,000 est. value
Waco, TX

Baylor University Moody Library First Floor Starbucks Renovation
Renovation - 786 SF
Design
$150,000 est. value
Waco, TX 76706

Bridge Maintenance
Infrastructure
Bidding
$3,831,954 CJ est. value
Waco, TX 76710

Bridge Maintenance
Infrastructure
Bidding
$3,831,954 CJ est. value
Waco, TX 76710

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2021 31st and Gurley Street Improvements Project
Infrastructure
Post-Bid
Beverly Hills, TX 76711

Foster Branch Addition Water Improvements Lots 1-6
Results
$60,000 est. value
Bruceville-Eddy, Cego, TX 76524

Construction of Water Improvements - James Killough
Results
Bruceville-Eddy, TX

Hawaiian Bros.
Renovation - 4,000 SF
Construction
Waco, TX 76706

Temporary Infrastructure For Portable Buildings And Demolition Of The Science Wing At Tennyson Middle School
Demolition, Renovation, Infrastructure
Construction
$771,252 CJ est. value
Waco, TX 76710

New Waco High School
New Construction, Infrastructure
Pending Verification
$119,000,000 CJ est. value
Waco, TX 76710

New Waco High School
New Construction, Infrastructure
Pending Verification
$119,000,000 CJ est. value
Waco, TX 76710

Proposed Fire Station 15 - City of Waco
New Construction, Infrastructure - 8,200 SF
Conception
$4,089,000 CJ est. value
Waco, TX 76701

Last Updated 10/20/2022 05:05 PM
Project Title

Starbucks / Hewitt

Physical Address View project details and contacts
City, State (County) Hewitt, TX 76643   (McLennan County)
Category(s) Commercial, Heavy and Highway, Sewer and Water
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $650,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans consist of construction of a Starbucks shell building and site work. The building has a slab on grade foundation, wood stud construction, electrical & plumbing. Project will include utilities work, concrete paving, and landscaping. As of October 20, 2022, a building permit has been issued. The identity of the general contractor has not been disclosed.

Details

2,390 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents