Similar Projects
Eve Circle Roadway & Drainage Improvements
Bidding
De Funiak Springs, FL 32433

Parking Lot Expansion Freeport Business Park
Bidding
FL

Don Bishop Road Cross Drain Replacement
Post-Bid
FL

Walton County Middle School Retaining Wall
Post-Bid
DeFuniak Springs, FL 32435

Drainage Repairs
Results
Less than $225,000 est. value

Drainage
Results
Less than $1,387,468 est. value
FL

Retention Pond Maintenance
Bidding
$25,000 est. value
FL

Drainage
Results
Less than $335,077 est. value
FL

Western Lake Phase I Drainage Improvements
Results
De Funiak Springs, FL 32433

Mack Bayou Road Drainage Improvements
Results
De Funiak Springs, FL 32433

Drainage
Results
Less than $300,000 est. value

Grassing, Seeding, Sodding
Results
Less than $500,000 est. value

Drainage
Results
Less than $200,000 est. value

NRDA Artificial Reef Construction 2019-20 Deployment FWC Grant 19021
Results
FL

Drainage
Results
Less than $400,000 est. value

Last Updated 01/18/2021 04:45 AM
Project Title

Grading

Physical Address View project details and contacts
City, State (County) DeFuniak Springs, FL 32433   (Walton County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consist of reshaping ditches and reworking shoulders along State Road 83 from Thad Bell Road (Mile Post 10.648) to Alabama State Line (Mile Post 19.116) and State Road 187 (US 331) from State Road 10 (US 90) (Mile Post 0.000) to Alabama State Line (Mile Post 21.565) in Walton County at designated locations. These ditches are non-typical and should be re-graded to +/- 3 inches of the original flow line to create a free and unobstructed flow of drainage water. For the purposes of this contract, the original flow line is considered to be the linear projection along the ditch bottom between the invert elevations of immediately adjacent drainage structures. Spoil material removed from ditches and shoulders shall be relocated to FDOT storage pits in Argyle or Liberty. Mobilization and Maintenance of Traffic. Section 0001 Asphalt Repair (Manual) (Tn) 0104- 10- 3 Sediment Barrier Lf 5,280.000 0339- 1- Miscellaneous Asphalt Pavement Tn 50.000 e120- 10- 2 Clean And Reshape Ditch (Haul) Lf 200.000 e570- 2- Seed & Mulch Sy 4,000.000 e570- 5- Fertilizer Tn 14.000 e570- 9- 1 Water For Grass & Plants Mg 80.000 e575- 1- Sodding Sy 80,000.000 e577- 70- Shoulder Rework Sy 80,000.000 e577- 71- Blading Paved Shoulder, Up To 24" Beyond Pavement Lf 20,000.000

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Roadway Signaling and Control Equipment, Traffic Signals.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents