Similar Projects
Parks and Recreation Ballard Green Fence Repairs
Bidding
Ridgefield, CT

Horse Unit 2 Paddock Fence Repairs
Post-Bid
Storrs, CT 06269

Riverside Park Fencing
Post-Bid
New London, CT 06320

Automatic Gate at Lake Mohegan
Results
Fairfield, CT

Dog Park Fence Repairs
Results
Waterford, CT

Installation of a Tennis Court Fencing and Tennis Court Surfacing
Post-Bid
Prospect, CT 06712

Driving Range Netting Replacement
Results
Less than $24,900 est. value
Greenwich, CT 06831

On Call Fence Maintenance and Repair and Installation Projects
Post-Bid
Stratford, CT 06615

Wapping Tennis Court Fence Work
Results
South Windsor, CT

Annual Requirements for Chain Link Fencing
Term Contract
Post-Bid
Bristol, CT

Lockwood-Mathews Mansion Historic Fence Restoration
Results
$500,000 to $999,999 est. value
Norwalk, CT 06850

Fence Repairs Services for Stamford Public Schools
Post-Bid
Stamford, CT

Sources Sought SKXJ142001 Repair Main Gate - 103 ACS
Results
$500,000 to $1,000,000 est. value
Orange, CT 06477

Raw Water Pump Station Intake Gates and Emergency Generator Fuel Tank Replacement
Post-Bid
Windham, CT

Wildlife Fence Replacement - Waterbury-Oxford Airport
Results
Oxford, CT 06478

Reported 09/16/2020 12:00 AM
Project Title

Cove River Tide Gate Reconstruction

Physical Address View project details and contacts
City, State (County) West Haven, CT   (New Haven County)
Category(s) Single Trades
Sub-Category(s) Fencing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center - 08/27/20
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located in West Haven at Cove River where Ocean Avenue changes nameto Captain Thomas Boulevard, and seeks to replace deteriorated tide gates and a pedestrian bridge. The existing flap gates will be replaced with a combination of stainless steel flap gates and self regulating tide gates (SRT), and the existing pedestrian bridge will be replaced with a prefabricated steel-truss pedestrian bridge with concrete deck. Work items include, but are not limited to: traffic control, pollution control, water handling, clearing and grubbing, existing structures removal, earthwork,installation of new structures, seeding and mulching.

Details

Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents