Similar Projects
Stanley Lake MUD - Waterline Extension
Infrastructure
Post-Bid
$129,963 CJ est. value
Conroe, TX 77301

Water, Sanitary and Drainage Facilities in Harpers Preserve Section 25
Infrastructure
Post-Bid
$1,710,000 CJ est. value
The Woodlands, TX 77380

Water - Sanitary Sewer - Drainage and Detention to Serve Newport Sections 6 and 10
Results
Newport, TX 76230

Waterline to Serve Lift Station No. 3 and Spring ISD
Results
TX

Contract E - Water Line Replacement Project
Infrastructure
Post-Bid
$2,147,348 CJ est. value
Anahuac, TX 77514

Water System Improvements
Infrastructure
Results
$663,634 CJ est. value
Mount Enterprise, TX 75681

Vision Park Drainage Improvements
Infrastructure
Post-Bid
$81,053 CJ est. value
Shenandoah, TX 77384

Construction of Water, Sanitary, Drainage and Paving Facilities for Audubon Creekside North Sec. 1
Results
$1,000,000 est. value
Montgomery, TX

FourWay Special Utility District Hanks Creek Water System Extension
Infrastructure
Post-Bid
$367,031 CJ est. value
Huntington, TX 75949

Water, Sanitary Sewer, and Drainage Facilities for wayside Village Section 6 and Parker Road
Results
Houston, TX

Northeast Loop 287 Utility Relocation
Infrastructure
Post-Bid
$1,386,846 CJ est. value
Lufkin, TX 75901

16" Two-Way Flow Altitude Valve
Results
$21,738 est. value
Laguna Heights, TX 78578

Carbon Pump Station Improvements
New Construction, Infrastructure
Post-Bid
$35,000,000 CJ est. value
Irving, TX 75038

Silver Springs West Richey Road Dedication, Section One
Results
Less than $1,009,711 est. value
Houston, TX 77040

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Last Updated 06/01/2023 02:14 PM
Project Title

Cypress 61 Plant Rehabilitation - City of Wichita Falls

Physical Address View project details and contacts
City, State (County) Wichita Falls, TX 76301   (Wichita County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $13,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for rehab or replacement. This rehabilitation project would affect all of the major components of the treatment train; flocculators, baffles, wiers, filter media, filter controls and filter backwash components. This rehab is also necessary to assure that this plant can meet all of the drinking water requirements. The project is included in the City of Wichita Falls 2023-2027 Capital Improvement Program (CIP). As of June 1, 2023, information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents