Similar Projects
Wastewater Collection System Improvements
Renovation, Infrastructure
Bidding
$3,200,000 est. value
Batesville, AR

Improvements to Robil and Cinch Wastewater Pump Stations
Renovation
Bidding
$2,000,000 est. value
Pocahontas, AR

Purcell Road Lift Station
New Construction
Post-Bid
$2,500,000 est. value
Paragould, AR

Jamison and Arch Street Pump Station Modifications
New Construction
Post-Bid
Little Rock, AR 72209

Jefferson Street Pump Station Improvements
Results
Fulton, AR

Field Pump Station Improvements
New Construction
Results
Redfield, AR

Bowles Street Pump Station Improvements
Renovation
Bidding
$2,000,000 est. value
Dumas, AR 71639

Wastewater System Improvements - Contract Section II (Wastewater Treatment Facility)
New Construction, Infrastructure
Post-Bid
Alpena, AR

Fairwood and Molly Creek Pump Station Improvements
New Construction
Results
Hot Springs, AR

Water Storage
New Construction, Infrastructure
Bidding
$4,000,000 est. value
Huntsville, AR

Birdtown Pump Station Upgrade
Addition, Alteration
Post-Bid
$400,000 est. value
Springfield, AR 72157

Blanchard Springs Caverns VIC Lift Station
Renovation
Results
Fifty-Six, AR 72533

Wastewater Pump Station Flood Damage Repairs and Mitigation Project Fourth Phase (PS-28 North 6th Street and PS-29 South 98th Circle No. 19-29-C4)
Renovation
Post-Bid
Fort Smith, AR

Wastewater Force Main and Pump Station Improvements
New Construction, Infrastructure
Results
$1,200,000 est. value
AR

Pump Station 3 and Pump Station 4 Rehabilitation and Common Force Main
Renovation
Post-Bid
West Memphis, AR

Reported 06/22/2022 12:00 AM
Project Title

Lift Station #1 Rehabilitation

Physical Address View project details and contacts
City, State (County) Jennette, AR   (Crittenden County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of rehabilitating the existing Lift Station #1 including, but not limited to, replacement of existing pumps and controls, associated piping, and all related appurtenances.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents