Similar Projects
CARTA Parking Lot Expansion
Infrastructure
Bidding
North Charleston, SC 29405

SC State House Portico Pavers North Side
Infrastructure
Bidding
$375,000 to $450,000 est. value
Columbia, SC 29201

Ramp Modification
Post-Bid
Less than $20,000 est. value
Eutawville, SC

Sidewalk Repair - District Office
Term Contract
Post-Bid
Anderson, SC 29625

Concrete Drives
Results
Gray Court, Waterloo, SC 29645

Two Notch Road #1328 Super Stop
Results
Less than $459,512 est. value
Columbia, SC 29223

CVS #2555 - ADA Site Renovations
Renovation - 4,500 SF
Construction
Gaffney, SC 29341

CVS #3565 - ADA Site Renovation
Renovation - 10,186 SF
Construction
Cheraw, SC 29520

Inspection and Repair of Walking Trail at Doko Meadows Park
Infrastructure
Bidding
Blythewood, SC 29016

CVS #7016 - ADA Site Renovations
Renovation - 2,491 SF
Post-Bid
Pawley's Island, SC 29585

Main Street Intersection Improvements
Results
Less than $899,010 est. value
Columbia, SC

Adams Drive Sidewalk Project, Phase 1
Infrastructure
Bidding
Abbeville, SC 29620

Resurface Existing Eigth (1/8) Mile Walking Track
Post-Bid
Saint Stephen, SC 29479

River Park Recreation Area-Trail Package
Results
Rock Hill, SC 29730

NSTEP Round 15 Sidewalk Improvements Project
Infrastructure
Bidding
Greenville, SC 29613

Reported 07/30/2021 12:00 AM
Project Title

SC HWY 170 Sidewalk Extension Project

Physical Address View project details and contacts
City, State (County) Beaufort, SC   (Beaufort County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SC-170 Sidewalk Extension Project is for the construction of an 8' wide sidewalk on Robert Smalls Parkway. The sidewalk is approximately 550' in length and will disturb 0.125 acres. The extension of sidewalk is on the southside of SC-170 and will be constructed to connect the existing sidewalk to the Spanish Moss Trail. Construction activities include sidewalk, storm drainage, site lighting, and landscaping improvements.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents