Similar Projects
Construction Services for Well 3 at Water Treatment Plant 2
Infrastructure
Bidding
$750,000 est. value
Mount Dora, FL 32757

Irrigation Well Replacement
Term Contract
Post-Bid
Land O' Lakes, FL 34639

Well Pump Diagnostic for Irrigation System NRCS FL
Post-Bid
Brooksville, FL 34601

New Condenser Water Return Well No.2
Term Contract
Results
Tallahassee, FL 32307

Live Oak Drainage Wells Phase 1
Results
Less than $400,000 est. value
Live Oak, FL

Centrifugal Dewatering 12" x 8" Self-Priming Pumps - Trailer Mounted
Post-Bid
FL

DX38 Dynamometer Pump and Motor Replacement Coast Guard Engineering
Results
$45,000 est. value
Miami Beach, FL 33139

Wet Well Cleaning
Post-Bid
North Port, FL

Reuse Irrigation Transfer Pumps
Results
Palatka, FL 32177

Well Testing, Drilling And Maintenance
Demolition, Term Contract
Post-Bid
FL

Mechanical Integrity Testing of the SRPF, WTP 11, and SROC Deep Injection Well Projects
Results
$145,000 est. value
Belle Glade, Boca Raton, Delray Beach, FL

Construction Services for the Cypress Lake Wellfield Production Wells
Post-Bid
Kissimmee, FL

G-310/G-335 950 CFS Pump Overhaul Project
Results
$2,660,000 to $2,940,000 est. value
West Palm Beach, FL

Progressive Cavity Pump - Sludge Feed Pump
Post-Bid
Port Saint Lucie, FL

Pump Rehabilitation and Repair
Results
Cape Coral, FL 33915

Last Updated 04/25/2022 08:29 AM
Project Title

Navarre Beach Waste Valve Replacement

Physical Address View project details and contacts
City, State (County) Navarre, FL 32566   (Santa Rosa County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope of work includes the replacement of the Waste Activated Sludge (WAS) and Return Activated Sludge (RAS) valve along with a manual bypass for the RAS/WAS pumping system at the Navarre Beach WWTF.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Sanitary Waste and Vent Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Maintenance of Earthwork, Excavation and Fill, Excavation, Fill, Backfill, Earthwork Methods.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents