Similar Projects
Last Updated | 05/12/2023 03:09 PM |
Project Title | Drainage Improvements at University Oaks Boulevard and Stallings Drive |
Physical Address | View project details and contacts |
City, State (County) | College Station, TX 77840 (Brazos County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $583,486 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of the drainage improvements for University Oaks Boulevard at Stallings Drive. The drainage improvement project will generally include: Removing the existing asphalt pavement, pulverizing the subbase and subgrade, constructing 2" asphalt pavement with curbs including subgrade, constructing a storm sewer system including culvert and headwall installation, and water and sewer work. Installing TCP, SW3P, block-sodding disturbed areas, and all other related work associated to the project as shown on the plans and specifications. Questions can be referred to Alan Degelman at adegelman@cstx.gov The deadline for submitting written requests for clarification is Thursday, May 4th, 2023, at 5:00 p.m. CT. Question Deadline: 2/20/2023 02:00 PM (CT) |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |