Similar Projects
Building Envelope Package at Pittsburgh International Airport
Alteration
Bidding
Pittsburgh, PA 15231

Curtain Wall Package at Pittsburgh International Airport
Alteration
Bidding
Pittsburgh, PA 15231

Masonry, Cleaning, Waterproofing and Repairs at Marshall Elementary, Marshall Middle and the Baierl Center
Post-Bid
Pittsburgh, PA 15237

TTHM Removal for Lougeay Road Tank
Post-Bid
Pittsburgh, PA 15221

Mount Oliver Municipal Building Facade Repair
Results
Mount Oliver, PA 15210

Removal and Replacement of Concrete Steps and Porch Deck
Results
Pittsburgh, PA 15204

Phipps Conservatory & Botanical Gardens
Renovation
Construction
$480,410 est. value
Pittsburgh, PA 15213

New Public Works Facilities
New Construction, Alteration
Bidding
$500,000 est. value
Swissvale, PA 15218

Public Works Garage Painting and Sealing
Post-Bid
Moon Township, PA 15108

Hartwood Acres Stables Wall Replacement and Upgrades
Results
Pittsburgh, PA 15238

TTHM Removal System For Braddock Hills Tanks 2A/2B
Post-Bid
Pittsburgh, PA 15221

Exterior Building Improvements at the Brentwood Middle/High School - General Construction
Results
Pittsburgh, PA 15227

Allegheny Commons North Promenade Rehabilitation - Segment A Construction Project
Post-Bid
Pittsburgh, PA 15203

Facade Improvements Authority Wide
Term Contract
Results
Pittsburgh, PA

North Park Skating Rink View Deck Repairs
Post-Bid
Allison Park, PA 15101

Last Updated 07/19/2021 01:08 PM
Project Title

Exterior Insulation and Finish System

Physical Address View project details and contacts
City, State (County) Clairton, PA 15025   (Allegheny County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall be responsible for all waste disposal, as well as all material needed for a repair and update of an existing EIFS. The Contractor shall recoat or resurface the current EIFS where necessary. The Contractor shall make any repairs necessary to restore the full functionality of the EIFS. The Contractor shall refresh or replace a finish coat that is troweled smooth. The finish coat shall be a color mixture that matches the existing EIFS color already installed on the building. The finish coat shall be a crack resistant acrylic. The Contractor shall install all of the above in a manner as to not cause any future water problems around windows and doors. The Contractor shall caulk all windows, doors and other openings where the EIFS abuts. Caulking shall match color of finish coat. Debris Removal and Site Restoration. The Contractor must leave the work site in the same condition as found upon the initial arrival of the Contractor. The Contractor must remove and dispose of all debris, installation materials, and adhesives according to all Local, State, and Federal regulations.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts