Similar Projects
Storm Water Crossing Bridge at Saint Peters Golf Club
New Construction, Infrastructure
Bidding
$151,868 est. value
Saint Peters, MO 63376

Barry County Farm Road 2040 Bridge 15900141 Over Capps Creek
New Construction, Infrastructure
Bidding
$700,000 est. value
Verona, MO 65769

11th Street over Corby Parkway Bridge Replacement
New Construction
Post-Bid
Saint Joseph, MO 64504

Clay County Bridge Replacement
New Construction
Post-Bid
Liberty, MO

Spanish Pond ADA Improvements
New Construction
Results
MO 63138

Buckner Tarsney Road Bridge Replacement North of Ryan Road
Results
Independence, MO

2022 Bond - City of Grandview
Renovation, Infrastructure
Bidding
$21,000,000 est. value
Grandview, MO

King Hill Bridge Replacement
New Construction
Post-Bid
Saint Joseph, MO

Highway N Bridge Repairs at Dardenne Creek Repairs
Results
Cottleville, MO

Construction of City of Fulton Bridge No. 15550111 Aid 2700509
New Construction, Infrastructure
Bidding
$500,000 est. value
Fulton, MO 65251

22nd Street Over Corby Parkway Bridge Replacement
New Construction, Infrastructure
Post-Bid
Saint Joseph, MO 64504

Washington County Bridge Replacement
Results
Potosi, MO

Bridge Replacement - Bridge No.15550111
Renovation
Bidding
$700,000 est. value
Fulton, MO 65251

Gene Field Road over North East Parkway Bridge
New Construction
Post-Bid
Saint Joseph, MO 64504

2021 Bridge Deck Sealing
New Construction
Results
Wildwood, MO

Last Updated 07/01/2022 01:13 AM
Project Title

Dade County Bridge Replacement

Physical Address View project details and contacts
City, State (County) Kirksville, MO 63501   (Adair County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a 77-foot single span prestressed concrete NU-girder bridge, approach roadway work, and any incidental work in accordance with the plans and specifications. The project is located on County Road 85, in Section 5, Township 31 N, Range 27 W, Dade County, Missouri, over West Prong of Sons Creek.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents