Similar Projects
Cline and Reiley Elementary Schools
New Construction, Renovation, Alteration
Conception
Alexandria, Cold Spring, KY 41076

Farmington Elementary School Cafeteria Addition
Addition
Design
$2,000,000 est. value
Mayfield, KY 42066

Cannonsburg Elementary School and Boyd County Career and Technical Center
Renovation
Design
$7,290,000 est. value
Ashland, KY

Woodland Elementary School HVAC Renovation
Renovation
Bidding
$3,000,000 est. value
Radcliff, KY 40160

Pole Building for Muhlenberg County Board of Education Central Office
New Construction, Infrastructure
Bidding
$163,000 CJ est. value
Powderly, KY 42367

CB Young Jr. Service Center Building 9 AHU Replacement
Renovation
Sub-Bidding
$20,000 CJ est. value
Louisville, KY 40209

Field Elementary School - Lift Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
Louisville, KY 40206

Garrison Elementary School Replacement
New Construction, Renovation - 47,000 SF
Post-Bid
Garrison, KY 41141

Re-Roof
Post-Bid
Less than $4,617,000 est. value
Morganfield, Sturgis, KY 42437

Cravens Elementary School
Renovation, Addition - 17,329 SF
Results
Less than $11,000,000 est. value
Owensboro, KY 42301

Phase 6A: Addition and Alterations
Addition
Results
Fort Mitchell, KY 41017

Johnson Elementary School
Construction
Less than $19,335,000 est. value
Fort Thomas, KY

Clearfield Elementary
Renovation, Addition
Construction
$8,000,000 est. value
Clearfield, KY 40313

Elevator and Lift Service
Term Contract
Sub-Bidding
Louisville, KY 40202

Outside Open Pavilions/Classrooms
New Construction
Post-Bid
Winchester, KY

Last Updated 08/03/2022 02:09 PM
Project Title

Estill Springs Elementary Phase 2 Renovation and Addition ESSER III

Physical Address View project details and contacts
City, State (County) West Irvine, KY 40336   (Estill County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project Schedule will be issued via addendum. The contract will include liquidated damages assessed at $1,000.00/day if the completion date is not met. Successful Bidders are required to furnish a 100% Performance and Labor and Material Payment Bond for this Project. The project is partially funded by ESSER III grant funds, Federal prevailing wages required by the Davis-Bacon Act will be applicable, including weekly submittal of certified payroll reports. The Owner reserves the right to reject any or all bids and to waive all informalities and/or technicalities where the best interest of the Owner can be served. Bid opening will be public, and contracts will be with the Owner. Bids from Small Business Enterprises (SBE, MBE, WBE, VOSB, etc.) are encouraged and supported. Each bid must be accompanied by a 5% Bid Bond. The bid will be submitted in duplicate on copies of the Form of Proposal located in the Volume One Project Manual Bidding and Contract Documents. Both copies of the Form of Proposal and Bid Bond shall be placed in a manila envelope and have the Project Name and Proposed Bid Package number affixed. No Bidder may withdraw a bid submitted for a period of sixty (60) days after the date set for the opening of bids. Estill County Board of Education (Owner) Will Receive Proposals Through Codell Construction Company (Construction Manager) to Furnish All Labor and Materials to Complete the Estill Springs Elementary Phase 2 Renovations and Addition - Esser Iii Project Located at 314 Main Street, Irvine, Ky 40336. Work Is to Be Performed in Accordance With Plans, Specifications, and Addenda Prepared by Ross Tarrant Architects (Architect), Staggs & Fisher (M/e Engineer), and Structural Design Group (Structural Engineers). The Project Is Partially Funded by Esser Iii Grant Funds, Federal Prevailing Wages Required by

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents