Similar Projects
Technology Place Street Extension - TR0120 - City of Norman
Infrastructure
Conception
$550,000 CJ est. value
Norman, OK 73071

Effluent Truck Wash Facility - SA0015 - City of Norman
Infrastructure
Conception
$492,950 CJ est. value
Norman, OK 73069

Grade, Drain and Surface - IS 35
Infrastructure
Design
$10,000,000 CJ est. value
Norman, OK 73069

Utilities - US 77
Infrastructure
Design
$1,250,000 CJ est. value
Noble, OK 73068

District 2 Luther Road Bridge Repair (N Canadian River & Railroad Bridge)
Infrastructure
Bidding
$3,000,000 CJ est. value
Oklahoma City, OK 74857

Bus Stop Additions and Improvements Project
Addition, Demolition, Infrastructure
Bidding
$60,000 CJ est. value
Norman, OK 73069

Horizontal Directional Drilling
Infrastructure
Post-Bid
Norman, OK

New Office Building - Solid Waste Division
New Construction - 6,311 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Norman, OK 73069

Moore Animal Shelter - Bid Package #1
New Construction, Infrastructure - 47,629 SF
Results
$6,492,069 CJ est. value
Moore, OK 73160

FYE 2023 Sidewalk Concrete Projects
Infrastructure
Results
$444,173 CJ est. value
Norman, OK 73069

Summit Valley Interceptor - City of Norman
Infrastructure
Pending Verification
$284,600 CJ est. value
Norman, OK 73069

Phase III projects - 2021 Bond - Moore Public Schools
New Construction, Renovation, Infrastructure
Pending Verification
$338,700,000 CJ est. value
Moore, OK 73160

I-44 - Utilities
Infrastructure
Conception
$885,851 CJ est. value
Norman, OK 73026

L. Dale Mitchell Park Expansions and Enhancements
Addition, Renovation, Infrastructure
Design
$30,000,000 CJ est. value
Norman, OK 73019

Wastewater Treatment Plant Improvements South Canadian Wastewater Treatment Plant
Renovation, Infrastructure
Post-Bid
$203,529,800 CJ est. value
Oklahoma City, OK 73170

Last Updated 06/30/2023 12:33 AM
Project Title

Benchmark Construction Office and Storage Building

Physical Address View project details and contacts
City, State (County) Norman, OK 73069   (Cleveland County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Below is a list of all the “Bid Packages” for the project: 1. Final Clean 2. Material Testing (By Owner) 3. Earthwork 4. Paving & Site Concrete 5. Site Utilities 6. Landscaping & Irrigation 7. Concrete Structure (Complete) 8. Masonry 9. Misc. Steel (Not Structure) 10.Steel Erection (Misc. Steel Only) 11.Millwork & Finish Carpentry 12.Roofing and Metal Panels 13.E.I.F.S. (Exterior Insulation Finish System) 14.Joint Sealants & Weather Barrier 15.Doors, Frames, and Hardware 16.Door & Hardware Installation 17.Sectional Doors 18.Glass & Glazing 19.Drywall & Framing Systems 20.Painting 21.Resilient & Tile Flooring 22.Signage (Bid at Later Date) 23.Specialties (Material) 24.Specialties (Install) 25.Pre-Manufactured Canopies 26.Roller Shades 27.Plumbing 28.HVAC 29.Electrica The scope of this project includes, but is not limited to, the following: site work and new construction of a 6,500 square foot office development, and a 1,000 square foot self-storage facility. As of June 2, 2023, a construction manager has been selected for this project, but a general contractor has not. A firm construction timeline for this project has not yet been released.

Details

,, 7,500 SF - 6,500 SF. 1,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents