Similar Projects
Maple Ridge Township Roof Replacements at Township Hall
Bidding
Alpena, MI

Roof Replacement
Alteration
Bidding
Benton Harbor, MI

Request for Minges Brook and Prairieview Roof Replacement
Post-Bid
Battle Creek, MI

Soo Locks Roof Replacement Project
Post-Bid
Sault Sainte Marie, MI

Roof Replacement on the Main Building at Genesee Career Institute
Results
Less than $205,387 est. value
Flint, MI

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

District Wide Roof Replacement Project
Post-Bid
Otisville, MI

Lakeland Correctional Facility - Various Roof Restoration Project
Results
Coldwater, MI 49036

2020 Roofing & Summer Projects Middle High School
Post-Bid
Three Oaks, MI 49128

Administration Roof Replacement
Results
Flint, MI 48503

Middle School Re-Roofing
Post-Bid
Marcellus, MI 49067

Swartz Creek-Gaines Elementary Roofing
Results
Swartz Creek, MI

Roof Replacement Project at Carman-Ainsworth High School
Post-Bid
Flint, MI 48532

2020 Roof Replacement, Phase II
Results
Benton Harbor, MI

Dieck Elementary Roofing Bid
Post-Bid
Swartz Creek, MI

Reported 05/28/2021 12:00 AM
Project Title

2021 Mason Consolidated High School Partial Roof Replacement

Physical Address View project details and contacts
City, State (County) Erie, MI 48133   (Monroe County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Tear-off the existing roof systems down to the steel roof deck 2. Replace any deteriorated steel deck for additional cost if necessary. 3. Replace any deteriorated wood nailer for additional cost if necessary 4. Mechanically fasten 2.0” of polyISO insulation board (R-12) to the steel roof deck. 5. Adhere fully tapered insulation system over the base layer of insulation 6. Install fully adhered 60-mil non-reinforced EPDM (rubber) roof system including all flashings and terminations per the manufacturer’s specifications. 7. Flash all curbs and penetrations per the manufacturer’s specifications. 8. Tie into the existing built-up roof 9. Furnish and install new 24 GA. kynar finished perimeter metal ( i.e., fascia, counterflashing, etc.) on all perimeter walls. Owner to choose standard color. 10. Clean up any roofing or related debris and haul away from jobsite.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents