Similar Projects
Z--INDE 236306-Replace Chiller Plants/Cooling Towers
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Philadelphia, PA 19106

Mastery Charter Schools Pastorius Elementary - HVAC Equipment Installation - Group 2
Alteration
Bidding
$4,191,675 est. value
Philadelphia, PA 19138

Mastery Charter Schools Wister Elementary - HVAC Equipment Installation - Group 2
Alteration
Bidding
$3,151,550 est. value
Philadelphia, PA 19144

BOILER SERVICE/REPAIR AND WATER TREATMENT
Post-Bid
Philadelphia, PA

Computer Room Upgrades - USBC
Post-Bid
Philadelphia, PA 19106

Design-Bid-Build (DBB), Building 633 River Water Cooling System, Philadelphia Naval Business Center (PNBC), Philadelphia, PA
Results
$5,000,000 to $10,000,000 est. value
Philadelphia, PA 19092

Machine Chiller Semi-Annual Preventative/Corrective Maintenance for NFPC
Results
Philadelphia, PA 19112

Mastery Charter School Smedley Elementary - HVAC Equipment Installation - Group 2
Alteration
Bidding
$2,798,750 est. value
Philadelphia, PA 19124

HVAC and Mechanical Products
Term Contract
Post-Bid

Chillers and Hotwater/Glycol Pipeline Replacement at Northeast Water Pollution Control Plant
Results
$4,000,000 to $5,000,000 est. value
Philadelphia, PA 19137

Fort Mifflin Building 55 Renovation - HVAC Construction
Alteration
Bidding
$20,000 to $50,000 est. value
Philadelphia, PA 19153

Bldg. 592 Mezzanine Ventilation Design & Installation
Post-Bid
$500,000 to $1,000,000 est. value
Philadelphia, PA

HVAC Maintenance/Repairs - Branches and Regionals
Term Contract
Results
Philadelphia, PA

Dehumidification System
Alteration
Bidding
$1,000,000 to $2,000,000 est. value
Philadelphia, PA 19131

Heat Pump Condenser
Post-Bid
Philadelphia, PA

Reported 05/14/2022 12:00 AM
Project Title

NAVFAC Rooftop HVAC Unit replacement at Building 3C, NSA-P

Physical Address View project details and contacts
City, State (County) Philadelphia, PA   (Philadelphia County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes demolition of existing A/C system in area 3C (RTU 3-3), existing ductwork, and suspended ceiling. Provide VFD HVAC system with emergency shutoff switch, ductwork, and controls. Provide an elevated steel platform on the roof to support the air handling unit and augment the existing roof ductwork penetrations. Provide suspended ceiling and LED light fixtures with updated controls. Existing fire alarm signals, speakers, and other appurtenances that are on the existing ceiling are to be temporarily supported or removed, salvaged, and reinstalled to the ceiling.

Details

Division 09 - Finishes, Ceilings.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Schedules for Electrical, Schedules for Lighting, Lighting Fixture Schedule.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents