Similar Projects
Brickell World Plaza - Phase 2b & 2c
New Construction
Conception
$10,000,000 CJ est. value
Miami, FL

Sunshine Villas
New Construction
Conception
Homestead, FL 33032

Miami Riverside Center
New Construction - 6,000,000 SF
Design
$80,000,000 est. value
Miami, FL

One Island Park
New Construction
Design
Miami Beach, FL

Work Order Contract 2020- Central Area
Bidding
Less than $2,500,000 est. value
FL

Total Wine #2306
Renovation, Build-Out - 20,016 SF
Bidding by Invitation
Miami, FL 33172

1212 Aventura
New Construction
Sub-Bidding
Miami, FL

Walmart Supercenter #6397-00
New Construction - 160,000 SF
Post-Bid
Miami, FL

Paradise Lakes Apartments
New Construction - 100,000 SF
Post-Bid
$25,000,000 est. value
Kendall, FL

VTC Work Order Contract 1 - North Area 1
Results
Less than $2,500,000 est. value
Carol City, FL

VTC Work Order Contract 3 - Central Area
Results
Less than $5,000,000 est. value
Miami, FL 33125

The Ritz-Carlton Residences
New Construction - 500,000 SF
Construction
$163,000,000 est. value
Sunny Isles Beach, FL

Sanctuary At Doral
New Construction - 485,678 SF
Construction
$70,000,000 est. value
Doral, FL

Miami Worldcenter - Sixth Street Miami
New Construction, Build-Out - 140,000 SF
Pending Verification
Miami, FL

Miami Worldcenter - Sixth Street Miami
New Construction, Build-Out - 140,000 SF
Pending Verification
Miami, FL

Last Updated 06/07/2019 03:58 PM
Project Title

Development of the Collins Park Artist Workforce Housing Project

Physical Address View project details and contacts
City, State (County) Miami Beach, FL   (Miami-Dade County)
Category(s) Commercial, Residential
Sub-Category(s) Apartments/Condominiums, Multi-Family Homes, Retail
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Proposer for a ground lease (the "Lease") for the development of an artist workforce housing project on a City-owned site of approximately 19,750 square foot (0.45 acres) located at 224 23rd Street (19,750 SF).
Details
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents