Similar Projects
B403 Extractor Utilities
Design
$25,000 est. value
Tulsa, OK

Haikey Creek Interceptor Phase 1 Improvements
Infrastructure
Bidding
$1,405,000 est. value
Broken Arrow, OK

Sanitary Sewer Plans for East Interceptor
Infrastructure
Bidding
$200,000 est. value
Poteau, OK

Haikey Creek Interceptor Rehabilitation - Phase 1
Infrastructure
Post-Bid
Tulsa, OK

New Splash Pad at the Atoka Sports Complex
New Construction, Infrastructure
Post-Bid
Less than $250,000 est. value
Atoka, OK 74525

4800-5300 Block Venture Road Sanitary Sewer Improvement
Results
$190,750 est. value
Enid, OK

Operation, Maintenance and Repair Services
Term Contract
Results
Oklahoma City, OK

The Woods Offsite Sanitary Sewer
Alteration
Construction
Coweta, OK

Orlando CDBG 2021 Sewer Line Replacement Project
Infrastructure
Bidding
$600,000 est. value
Orlando, OK

Remove and Replace Sewer Line
Infrastructure
Post-Bid
Hartshorne, OK

Bethany - Warr Acres Public Works Authority CIP Project No 12 - Phase 1
Infrastructure
Results
Warr Acres, OK

Haikey Creek Interceptor Rehabilitation Phase 2
Infrastructure
Bidding
$2,285,000 est. value
Bixby, OK 74008

Emergency 8-Inch Sanitary Sewer Repair
Infrastructure
Post-Bid
OK 73103

Basin 10 Sewer
Infrastructure
Results
Mustang, OK

Sanitary Sewer Leak Repair Bid Packet
Infrastructure
Bidding
$250,000 est. value
Muskogee, OK

Last Updated 05/23/2022 11:35 AM
Project Title

36-inch PVC Gravity Sewer Pipe Material Project

Physical Address View project details and contacts
City, State (County) Moore, OK   (Cleveland County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The supply of 36-inch PVC Gravity Sewer Pipe material FOB job site to Contractor selected by MPWA for the construction of gravity sewer Improvements. MPWA will be bidding the Gravity Sewer Construction Improvement project simultaneously construction is projected to start by the second week of October 2021 last approximately 300 Calendar days. Supply approximately 7702 Lineal Feet of 36-inch Closed Profile PVC Pipe as manufactured by VYLON Pipe, FOB job site in Moore, OK, and in compliance with ASTM F-1803 with Pipe Stiffness of 46 psi complete per Plans, Specifications. Sewer pipe installation contractor will be selected by MPWA and the installation by Contractor shall be in accordance with the Gravity Sewer PVC Pipe Installation Manual. Bedding, backfilling, general installation requirements shall comply with ASTM D-2321. This project when completed will transport wastewater from the existing Lift Station located west of Sunny Lane on 34th Street to the new Southeast Lift Station under construction on Indian Hills Road east of Indian Hills Road.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents