Similar Projects
Bowie High School - Phase 4 - 2019 Bond - Arlington Independent School District
Addition, Infrastructure, Renovation
Conception
$13,295,613 CJ est. value
Arlington, TX 76018

Emergency Operations Center (EOC) Relocation Project - City of Southlake
Demolition, New Construction, Infrastructure - 3,000 SF
Conception
$1,703,000 CJ est. value
Southlake, TX 76092

Fort Worth Country Day Lower School
New Construction, Infrastructure - 30,384 SF
Design
$12,862,400 CJ est. value
Fort Worth, TX 76109

Main Street Gasoline Service Station
New Construction, Infrastructure - 10,000 SF
Design
$2,640,000 CJ est. value
Mansfield, TX 76063

Trail Lakes Apartments
New Construction, Infrastructure - 45,000 SF
Post-Bid
$6,500,000 CJ est. value
Fort Worth, TX 76133

Eagle Mountain-Saginaw ISD Elementary #18: Remaining Trades
New Construction, Infrastructure
Post-Bid
$35,000,000 CJ est. value
Fort Worth, TX 76179

Annual Requirements Contract for Drill Shafts
Term Contract
Results
Arlington, TX

2021 Como Area Resurfacing Project
Infrastructure
Results
$914,505 est. value
Fort Worth, TX

Key School
New Construction
Construction
Fort Worth, TX 76119

Deloitte University
Renovation
Construction
$2,000,000 est. value
Westlake, TX 76262

Stonemont-Harmon Road / Harmon Road Spec Warehouse
New Construction, Infrastructure - 485,680 SF
Pending Verification
$20,446,233 CJ est. value
Fort Worth, TX 76177

Kirkwood Oaks - Addition and Site
Addition, Demolition, Infrastructure - 4,300 SF
Pending Verification
$2,500,000 CJ est. value
Southlake, TX 76092

Library and Multi-use Facility - 2022-83 - City of Southlake
New Construction, Infrastructure - 60,000 SF
Conception
$41,750,000 CJ est. value
Southlake, TX 76092

Carter Junior High Replacement, Carter, Knox, Roark Demo - Phase 3 - 2019 Bond - Arlington Independent School District
Demolition, New Construction, Infrastructure
Design
$57,400,000 CJ est. value
Arlington, TX 76010

Pinnacle Montessori Academy / Ft Worth
New Construction, Infrastructure - 11,530 SF
Post-Bid
$2,340,590 CJ est. value
Fort Worth, TX 76177

Last Updated 04/17/2023 05:13 PM
Project Title

RFQ D/B - Design Build for Maverick Hall

Physical Address View project details and contacts
City, State (County) Arlington, TX 76007   (Tarrant County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Paving/Reconstruction, Site Development
Contracting Method Design-Build Firm to Subcontract, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $75,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The University of Texas at Arlington is issuing a Request for Qualifications for a Design/Build team for new residence hall, Maverick Hall. Vendors who received this RFQ other than directly from the University are responsible for checking this website for any updates, addenda, etc. and should email the contact person with your information to register that you have received this RFQ. Maverick Hall on the University of Texas at Arlington campus is a planned residence hall to be located adjacent to the newly constructed West Hall. The new residence hall will be located in the space that is currently a parking lot on the North side of West Hall along UTA Blvd. Due to the continued growth at the University of Texas at Arlington, there is an immediate need for more residence hall space on campus. The new Maverick Hall will be 140,000 gross square feet and will include over 500 beds. Due to the short construction schedule, to be outlined below, this will be a design-build project. Though it will be located directly next door to West Hall, the University wants Maverick Hall to be an upgrade from West Hall and not an exact copy. It should resemble The Commons building located next to the parking garage on Nedderman Dr. It will be constructed to the UTA Guideline specifications, which will be attached to this document, with the goal of having a 50-year life cycle. Due to its proposed location, it is desired to have the main entrance to the building facing to the Southeast towards The Commons. Though it will be replacing a surface parking lot, no additional parking will be required for this project. The adjacent parking garage will provide the necessary residence hall parking. The proposed building will be designed to LEED Silver criteria but will not be certified by the USGBC

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents