Similar Projects
Mid-Block Crossing U City
Infrastructure
Conception
$1,000,000 CJ est. value
Philadelphia, PA 19104

I-95: Betsy Ross Main Lane NB
Infrastructure
Conception
$287,800,000 CJ est. value
Philadelphia, PA 19106

Byberry North Business Center
New Construction, Infrastructure - 656,904 SF
Design
$320,000,000 CJ est. value
Philadelphia, PA 19116

Conshohocken Avenue Mixed-Use Residential Development
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Philadelphia, PA 19131

Central Access Philadelphia Project, Design Activities:Bridge, Retaining Walls and Highway Lighting
Demolition, New Construction, Infrastructure
Bidding
$225,000,000 CJ est. value
Philadelphia, PA 19106

Wissahickon Transportation Center
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Philadelphia, PA 19128

FY 2022 Site Improvements and General Construction Requirements Contract
Renovation, Infrastructure
Post-Bid
Less than $750,000 est. value
Philadelphia, PA

BSS City Hall Reverse Signaling Project
Demolition, New Construction, Infrastructure
Post-Bid
$7,000,000 CJ est. value
Philadelphia, PA 19107

Down Guy and Catenary Foundation Installation
Infrastructure
Results
Philadelphia, PA

Site Improvements at G. W. Childs School - General
Infrastructure
Results
$221,131 est. value
Philadelphia, PA 19146

Crown 95 Logistics Center / Philadelphia
New Construction, Infrastructure - 381,200 SF
Construction
$205,000,000 CJ est. value
Philadelphia, PA 19134

Chestnut Street Multi-Residential
New Construction, Infrastructure - 447,696 SF
Construction
$125,000,000 CJ est. value
Philadelphia, PA 19139

Spruce Street Mixed-Use Development
New Construction, Infrastructure - 149,500 SF
Pending Verification
$75,000,000 CJ est. value
Philadelphia, PA 19139

5th + Spring Garden
New Construction, Infrastructure - 15,320 SF
Pending Verification
$200,000,000 CJ est. value
Philadelphia, PA 19123

Washington Lane Corridor Safety Improvements
Infrastructure
Conception
$4,697,400 CJ est. value
Philadelphia, PA 19138

Last Updated 11/15/2022 01:03 PM
Project Title

Northern Gateway Tower at Temple University

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19122   (Philadelphia County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Dormitory, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected June 2020
Bids Due View project details and contacts
Estimated Value $3,379,200 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New residential tower for Temple University in Philadelphia. This project is part of a larger master plan to re-develop the university campus over the course of five or more years. The master plan document is attached and includes a list of consulting and analysis firms. As of January 2019, this project remains on hold. The project is expected to remain on hold until August 2019. While a firm construction timeline has still not been established, work is expected to begin summer 2020 at the earliest.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents