Similar Projects
Circuit Court Cell Replacement - F580700 - Anne Arundel County
Renovation
Conception
$1,563,000 CJ est. value
Annapolis, MD 21401

Phase 4 - Retrofit Exterior for Parking/Sallyport - 58042 - Cecil County
Addition, Demolition, Infrastructure, Renovation
Conception
$1,000,000 CJ est. value
Elkton, MD 21921

RFP D/B - Caroline County Detention Center Renovations and Addition
Addition, Demolition, Renovation, Infrastructure - 12,100 SF
Post-Bid
$3,000,000 CJ est. value
Denton, MD 21629

Addition to Detention Center Intake Area
Addition, Demolition, Renovation, Infrastructure - 5,700 SF
Post-Bid
$480,000 CJ est. value
La Plata, MD 20646

Frederick County Adult Detention Center Phase IV - Medical Center Expansion
Addition, Infrastructure - 15,000 SF
Results
$10,667,835 CJ est. value
Frederick, MD 21704

Frederick County Adult Detention Center Phase IV - Medical Center Expansion
Addition, Infrastructure - 15,000 SF
Results
$10,667,835 CJ est. value
Frederick, MD 21704

Adult Detention Center Design Build Addition Renovation
Addition, Demolition, Renovation, Infrastructure
Construction
$25,696,000 CJ est. value
Leonardtown, MD 20650

Construct Pavilion for Exercise Equipment - Cheltenham Youth Facility
Infrastructure
Construction
$57,462 CJ est. value
Cheltenham, MD 20623

Montgomery County Correctional Facility Refresh - P422302 - Montgomery County
Renovation
Conception
$3,600,000 CJ est. value
Boyds, MD 20841

Baltimore Therapeutic Treatment Center - Maryland Department of General Services
Renovation, Infrastructure
Post-Bid
$15,000,000 CJ est. value
Baltimore, MD 21202

Renovate Showers at the Maryland Reception Diagnostic Classification Center
Renovation
Results
$500,000 to $1,000,000 est. value
Baltimore, MD 21202

Construct 24' X 30' Building at Green Ridge Youth Center
New Construction, Infrastructure
Construction
$39,000 CJ est. value
Flintstone, MD 21530

Retrofit Exterior for Parking/Sallyport - 58042 - Cecil County
Demolition, New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Elkton, MD 21921

Mezzanine and Guard Shack
New Construction, Infrastructure - 149 SF
Post-Bid
$121,420 CJ est. value
Salisbury, MD 21801

Frederick County Adult Detention Center Phase IV Medical Addition
Addition
Results
$2,600,000 est. value
Frederick, MD 21704

Last Updated 07/25/2023 10:14 AM
Project Title

St. Mary's County Detention Center Renovation

Physical Address View project details and contacts
City, State (County) Leonardtown, MD 20650   (Saint Marys County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected January 2020
Bids Due View project details and contacts
Estimated Value $25,696,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The core 67,000 square foot facility was built between 1 987-1989 with a small expansion built in 1996. Project includes: (1) The design and construction of a 12,922 gross square foot 64 bed housing unit. The additional Pod - F will address the need to segregate the female population, will provide swing space during the planned renovations, will avoid significant fiscal impacts of incremental operating costs associated with relocation and temporary housing of inmates that must be displaced during the renovation of the facility, will address average daily population issues (Capacity = 232 and current ADP in January 2016 = 220 which is greater than the 70% capacity standard), and provide some relieffor future population growth. (2) The design and construction of a 7,333 gross square foot medical services unit which will include spaces for clinic , infirmary, and medical administration, 762 square foot new central control, and 1 339 square foot shell space. (3) Renovation ofthe 1 834 square foot vacated existing medical services area for Pre-trial Services office space and laundry services area. (4) Remaining renovations and upgrades identified in a prior PF 1405 project associated with Security and HVAC: Security system biometric upgrades, replacement ofthe 1 989 electronic locking control panels I mechanisms, full upgrade of the control booth consoles and central control as well as installation of P based cameras (30 of 84 have been installed prior); new IT server cabinet I room, wiring for video visitation capability and Court Commissioner kiosks; Inmate cell intercom panels, door release console replacement and fire panel I system upgrades; Upgrading the HVAC system I controls and heating I hot water upgrades (new boilers) to incorporate air-conditioning for improved air quality, staff working environment and inmate living conditions; flat roof and facility floor tile replacement; upgrade and renovation of the Central Control Room; upgrade of electrical panels for the new HVAC system; kitchen floor replacement per the Health Department; replacement of special confinement cell doors I food chutes (x 35) and food chute stainless steel upgrades (x57) to dayrooms (Pods A,B,C,D,E, dayrooms, and isolation). Timing to request FY2019 State funds: Facility Program Part I - Project Justification (Aug 2016), Facility Program Part II - Detailed Project Description (March 2017), Grant Funding Request (by June 30, 2017), State Public Hearings (Sept 2017), State decision on funding (April 2018) Design: 9-1 2 months (after Part I and Part II Facility Program) Construction of Medical and Housing: 12-18 months A general contractor has been awarded as of December 2018. It is anticipated construction will start in 2020, with design to be done in 2019.

Details

13,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents