Last Updated | 07/25/2023 10:14 AM |
Project Title | St. Mary's County Detention Center Renovation |
Physical Address | View project details and contacts |
City, State (County) | Leonardtown, MD 20650 (Saint Marys County) |
Category(s) | Government/Public |
Sub-Category(s) | Prison/Jail |
Contracting Method | Competitive Bids |
Project Status | Design Development, Construction start expected January 2020 |
Bids Due | View project details and contacts |
Estimated Value | $25,696,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The core 67,000 square foot facility was built between 1 987-1989 with a small expansion built in 1996. Project includes: (1) The design and construction of a 12,922 gross square foot 64 bed housing unit. The additional Pod - F will address the need to segregate the female population, will provide swing space during the planned renovations, will avoid significant fiscal impacts of incremental operating costs associated with relocation and temporary housing of inmates that must be displaced during the renovation of the facility, will address average daily population issues (Capacity = 232 and current ADP in January 2016 = 220 which is greater than the 70% capacity standard), and provide some relieffor future population growth. (2) The design and construction of a 7,333 gross square foot medical services unit which will include spaces for clinic , infirmary, and medical administration, 762 square foot new central control, and 1 339 square foot shell space. (3) Renovation ofthe 1 834 square foot vacated existing medical services area for Pre-trial Services office space and laundry services area. (4) Remaining renovations and upgrades identified in a prior PF 1405 project associated with Security and HVAC: Security system biometric upgrades, replacement ofthe 1 989 electronic locking control panels I mechanisms, full upgrade of the control booth consoles and central control as well as installation of P based cameras (30 of 84 have been installed prior); new IT server cabinet I room, wiring for video visitation capability and Court Commissioner kiosks; Inmate cell intercom panels, door release console replacement and fire panel I system upgrades; Upgrading the HVAC system I controls and heating I hot water upgrades (new boilers) to incorporate air-conditioning for improved air quality, staff working environment and inmate living conditions; flat roof and facility floor tile replacement; upgrade and renovation of the Central Control Room; upgrade of electrical panels for the new HVAC system; kitchen floor replacement per the Health Department; replacement of special confinement cell doors I food chutes (x 35) and food chute stainless steel upgrades (x57) to dayrooms (Pods A,B,C,D,E, dayrooms, and isolation). Timing to request FY2019 State funds: Facility Program Part I - Project Justification (Aug 2016), Facility Program Part II - Detailed Project Description (March 2017), Grant Funding Request (by June 30, 2017), State Public Hearings (Sept 2017), State decision on funding (April 2018) Design: 9-1 2 months (after Part I and Part II Facility Program) Construction of Medical and Housing: 12-18 months A general contractor has been awarded as of December 2018. It is anticipated construction will start in 2020, with design to be done in 2019. |
||||||||||||||||||||||||||||||||||||||||||
Details | 13,000 SF.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |