Similar Projects
Askvig Subd Outfall to Kyte Creek and Storm sewer and Drainage improvements PH 1 - City of Rochelle
Infrastructure
Conception
$1,000,000 CJ est. value
Rochelle, IL 61068

Askvig Subd Outfall to Kyte Creek and Storm sewer and Drainage improvements PH 1 - City of Rochelle
Infrastructure
Conception
$1,000,000 CJ est. value
Rochelle, IL 61068

Byron Township Seal Coat
Infrastructure
Design
$81,047 CJ est. value
Byron, IL 61010

Byron Township Seal Coat
Infrastructure
Design
$81,047 CJ est. value
Byron, IL 61010

Lead Service Line Replacement Program
Infrastructure
Bidding
$800,000 CJ est. value
Polo, IL 61064

Lead Service Line Replacement Program
Infrastructure
Bidding
$800,000 CJ est. value
Polo, IL 61064

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Watermain Improvements
Infrastructure
Results
$550,661 CJ est. value
Stillman Valley, IL 61084

Watermain Improvements
Infrastructure
Results
$550,661 CJ est. value
Stillman Valley, IL 61084

Willis Senior Lofts
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Rochelle, IL 61068

Municipal Bridge Replacement 2 Each - City of Rochelle
Addition, New Construction, Infrastructure, Renovation
Conception
$4,060,000 CJ est. value
Rochelle, IL 61068

New Library - Creston-Dement Public Library
New Construction, Infrastructure
Design
$2,200,000 CJ est. value
Creston, IL 60113

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Mill Road Shared-Use Path Extension
Infrastructure
Results
$415,651 est. value
Byron, IL 61010

Last Updated 01/05/2024 09:33 AM
Project Title

2024 Site Improvements at Rochelle Township High School & Tilton Elementatry School

Physical Address View project details and contacts
City, State (County) Rochelle, IL 61068   (Ogle County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

1. Contract 01: Project Consists of the removal and replacement of asphalt, concrete curb and gutter, storm structures, concrete sidewalk, pavement striping, mud jacking existing sidewalk, site restoration, and associated work as identified here-in at Rochelle Township High School. 2. Contract 02: Project Consists of the removal and replacement of asphalt, concrete curb and gutter, storm structures, storm piping, site grading for detention basin, concrete sidewalk, pavement striping, signage, site restoration, and associated work as identified here-in at Tilton Elementary School. 3. There is an option to bid both Contract 01 and Contract 02 as a combined contract. 4. Type of Contract: a. Each Contract will be constructed under a single prime contract.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents