Similar Projects
Last Updated | 07/01/2021 03:02 PM |
Project Title | State Route 4 and Scott Farms Blvd Traffic Signal |
Physical Address | View project details and contacts |
City, State (County) | Marysville, OH (Union County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Traffic Signalization |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $282,750 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project work consists of the following: Installation of combination signal poles and signal heads at the State Route 4 and Scott Farms Blvd intersection. Installation of traffic signal controller cabinet. Installation of conduit, fiber optic cable, and video detection systems. Installation of other necessary construction items related to the traffic signal construction. Necessary restoration (including asphalt, driveway, sidewalk and curb replacement, seeding, plantings, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |