Similar Projects
Waks Memorial Park - Ballfield 2 Infield Renovation
Renovation
Bidding
$194,000 est. value
Wayne, NJ 07470

Hofstra Park Soccer Field Improvements
Post-Bid
Prospect Park, NJ

Playground Improvements at Wagaraw Road
Renovation
Post-Bid
Hawthorne, NJ 07507

PAL Turf Field
Results
Totowa, NJ 07512

Installation of Synthetic Turf for PAL Turf Field
Results
Totowa, NJ 07512

Garret Mountain Reservation Improvements - Phase 2
New Construction, Infrastructure
Post-Bid
Woodland Park, NJ 07424

Lou Costello Memorial Park Improvements
Results
Paterson, NJ 07501

Construction Administration Services for the Quarry Lawn and River Walk Park Development Project
Renovation
Post-Bid
Paterson, NJ

Kilroy Park Splash Pad and Patio Renovation
Results
Wayne, NJ 07470

Quarry Lawn and River Walk Improvement Project Block 4601, Lots 1, 2, and 4
Renovation
Post-Bid
Paterson, NJ

Latona Griffin Park Improvements - 100 Steps Reconstruction
Results
Passaic, NJ

Playground Area Hardscaping - 34th Street Campus
Renovation
Post-Bid
Paterson, NJ 07514

Improvements to Third Ward Spray Park
Renovation
Results
Passaic, NJ 07055

Clifton BOE Tennis Court Marching Band Field
Renovation
Post-Bid
$1,400,000 est. value
Clifton, NJ 07013

Bubbling Springs Park Ballfield Reconstruction Project
Results
West Milford, NJ 07480

Last Updated 05/03/2022 07:41 AM
Project Title

Columbia Park Site Improvements

Physical Address View project details and contacts
City, State (County) Passaic, NJ 07055   (Passaic County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Coordinate with PSE&G utilities for installation of a New Electric Service, 2. Furnish and Install a pad mount Electric Cabinet to be utilized as a mounting surface for new service meter, and to house electric panels, equipment, and associated materials. Cabinet shall be rated NEMA 3R minimum, 3. Furnish and install decorative light fixtures (pole and fixture head) controlled by a 24 hour astronomical time clock. Coordinate with owner for hours of operation, 4. Provide a circuit for pole mounted receptacles, 5. Included in the Base Bid is for the Contractor to provide spare 2” conduits and junction box as shown on the Contract Drawings for a New Security System (this New Security System shall be included in the Contractor’s bid as an Alternate). 6. All associated conduit and wiring between enclosures and light fixtures

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents