Similar Projects
Murphy USA #7206/7851 / Glasgow
Demolition, New Construction, Infrastructure - 208 SF
Conception
$1,500,000 CJ est. value
Glasgow, KY 42141

Construct Event and Conference Center - Murray State University
New Construction, Infrastructure
Conception
$8,198,000 CJ est. value
Murray, KY 42071

Asphalt Resurfacing - KY 100
Infrastructure
Design
$300,000 CJ est. value
Franklin, KY 42134

Freys Hill Road New Apartments
New Construction, Infrastructure
Design
$120,000,000 CJ est. value
Louisville, KY 40241

Sports Complex: Light Pole Installation Project
Infrastructure
Bidding
$50,000 CJ est. value
Catlettsburg, KY 41129

Georgetown Municipal Water and Sewer Service - Rogers Gap Pump Station Replacement
Demolition, New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Georgetown, KY 40324

Shawnee Apartments Renovation and New Construction
New Construction, Renovation, Infrastructure
Sub-Bidding
$15,000,000 CJ est. value
Louisville, KY 40203

St. Claire Medical Center Firestopper Repair
Renovation - 82,000 SF
Post-Bid
Morehead, KY 40351

Gas and Water Utility Relocation
Post-Bid
Grayson, KY

Chiller and Water Replacement at Westport Middle School
Results
Louisville, KY 40222

Distribution System Site Development
Renovation
Results
Burgin, Harrodsburg, KY 40330

Water and Sewer Infrastructure
Infrastructure
Pending Verification
$2,336,513 est. value
Pikeville, KY

Greenway Sports Complex
New Construction, Infrastructure
Pending Verification
$42,000,000 CJ est. value
Paducah, KY 42001

Reduce Congestion on the Hal Rogers Parkway
Infrastructure
Conception
$5,080,000 CJ est. value
London, KY 40741

Mount Washington Road Mixed-Residential Development
New Construction, Infrastructure - 16,000 SF
Design
$50,000,000 CJ est. value
Louisville, KY 40229

Last Updated 09/07/2022 01:05 PM
Project Title

Rizer Avenue Pump Station Replacement

Physical Address View project details and contacts
City, State (County) Springfield, KY 40069   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $280,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Construction of a new 350 gpm pump station to replace the existing Rizer Avenue Pump Station. Work includes two (2) 15 hp submersible pumps, precast wet well, precast valve vault, gravity sewer to new wet well, tie-in to existing force main, and demolition of the existing wet well and pump housing. This project is expected to be funded in part with funds provided by the U.S. Department of Agriculture, Rural Utilities Service (RUS). Refer to Article 18 of the General Conditions for information on the federal requirements. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies, Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies to American Iron and Steel requirement to this project. All listed iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron and steel: lines or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. The de minimis and minor components waiver, pig iron and nuts and bolts all apply to this contract. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Furnish all labor, materials, tools, equipment and services as indicated in accordance with provisions of Contract Documents. 2. It is the intent of the Contract Documents to describe a functionally complete project. Furnish and install all supplementary or miscellaneous items, appurtenances, and devices incidental to or necessary for a sound, secure, complete, and functional installation New (replacement) sanitary sewer pump station and appurtenances.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents