Similar Projects
Fresenius Medical Care Dialysis / Chicago
Renovation, Demolition - 20,000 SF
Conception
$4,000,000 est. value
Chicago, IL 60651

Demolish Trent Barn and Construct Replacement Building at The Lincoln's New Salem State Historic Site
New Construction, Demolition
Design
Petersburg, IL 62675

Demolition for Renovate / Construct Nursing Lab, including a Simulated Hospital
Demolition
Bidding
$2,500,000 est. value
Chicago, IL 60628

Demolition of the Pool
Demolition
Bidding
$200,000 est. value
Delavan, IL

Demolition and Site Clearance of Identified Structures
Demolition
Post-Bid
IL

Building Demolition 3138 W 95th Street
Post-Bid
Evergreen Park, IL 60805

2021 Train Station Grade Stair Demolition and Replacement
Demolition
Results
Palatine, IL

Library Relocation
Demolition
Results
Elgin, IL 60123

Westview Center III Parking Improvement and Bell Tower Removal
Demolition, Alteration
Construction
Streamwood, IL 60107

Demolition of Residential Structures
Demolition
Bidding
$12,000 est. value
Altamont, IL 62411

Demolition of 3 Washington Court
Demolition
Post-Bid
Park Forest, IL

Asbestos Abatement
Demolition
Results
Maroa, IL 61756

Demolition of 316 Niagara Street
Post-Bid
Park Forest, IL 60466

Gas Station Demolition
Demolition
Results
Grayslake, IL 60030

2021 Residential Demolition
Post-Bid
Harvey, IL

Reported 06/30/2022 12:00 AM
Project Title

Demolition of Commercial Property at 102 and 104 West South Street

Physical Address View project details and contacts
City, State (County) Greenville, IL 62246   (Bond County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project involves two commercial buildings that are connected, approximately 6800 square foot total. Structures contains an unknown, presumed partial basement. Foundation and basement walls are of concrete and/or block construction. Will include removal approximately 30' of private and approximately 48' of city sidewalk. There will be no pre-bid interior inspections Proposed Project Description A. Complete demolition and removal of entirety of all structures, including basement(s), footings, 20 feet of private sidewalk on the north side of building and 48 feet of city sidewalk on the east side of building. B. City sidewalks on the north side of building, to be preserved or replaced. C. Disconnection and appropriate capping off of all utilities. D. Removal and disposal of all fencing, brush, and/or landscaping on property, grass/yard and mature trees excluded. E. Removal and disposal of any and all outbuildings/storage sheds on property. F. Backfill of all disturbed areas of site with suitable clean fill dirt with compacting and leveling for final grade. No construction material is allowed as fill. G. Complete removal and disposal of all debris. Debris must be disposed of in accordance with all State, Federal, and local laws.

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents