Similar Projects
New Board Office for Trussville City Schools
Results
Trussville, AL 35173

Phase I Controlled Entry-Point Renovation
Renovation
Results
Birmingham, AL 35203

New Fultondale High School Phase II
New Construction - 109,974 SF
Results
Less than $35,569,000 est. value
Birmingham, AL

Mountain Brook High School Classroom Addition and Renovation
Renovation, Addition - 69,340 SF
Construction
Less than $20,000,000 est. value
Mountain Brook, AL 35223

Renovation at Vestavia Hills High school Fieldhouse
Renovation
Results
$168,000 est. value
Vestavia Hills, AL 35216

Additions and Renovations to Fairfield High Preparatory School
Renovation, Addition
Post-Bid
Fairfield, AL

Replacement and Upgrade of ALC Controls
Post-Bid
Trussville, AL 35173

Portable Classrooms at Legacy Prep School
New Construction
Post-Bid
Birmingham, AL

Classroom Renovation and Upgrades for the Midfield City Schools - Midfield High Career Tech Building Barbering Classroom
Renovation
Post-Bid
Midfield, AL

Renovations to Fairfield City Schools
Renovation
Results
$527,600 est. value
Fairfield, AL 35064

HVAC Upgrades Installation of Bipolar Ionization or Non-Thermal Plasma Technology for Midfield City Schools
Renovation
Post-Bid
Birmingham, AL

BCS Woodlawn High School Football Stadium and Field House
New Construction
Results
$8,088,660 est. value
Birmingham, AL 35212

Security Enclosure Renovations Phase II - C
Renovation
Results
$500,000 est. value
Birmingham, AL

Security Enclosure Renovations Phase II - A
Renovation
Results
$500,000 est. value
Birmingham, AL

Security Enclosure Renovations Phase II - B
Renovation
Results
$500,000 est. value
Birmingham, AL

Reported 12/22/2021 10:49 AM
Project Title

Additions and Renovations to Mountain Brook Junior High School

Physical Address View project details and contacts
City, State (County) Birmingham, AL 35213   (Jefferson County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced second quarter 2021
Bids Due View project details and contacts
Estimated Value $14,381,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will consist of a new 3-story addition that connects the existing second floor levels and third floor level together. The addition will be composed of a new main entrance with a 2-story volume lobby space and grand stair. It will also house the ICC-500 rated storm shelter on the first floor. The second and third floors of the addition will consist of 18 classrooms. There will be other renovations throughout the interiors including expanding the existing cafeteria and connecting it to a Multi-purpose, overflow, space. The renovations will help eliminate congestion and increase safety during class change. Additionally, the existing classroom wing along Overbrook Road is scheduled for a new roof as a part of needed building maintenance.

Details

Middle/Senior High School, 3 Stories Above Grade, 43,500 SF Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 14 - Conveying Equipment.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents