Similar Projects
Cedarwood Elementary School Classroom Wing Addition
Addition
Conception
$13,900,000 est. value
Clovis, CA 93611

New Elementary School - Clovis Unified School District
New Construction, Infrastructure
Conception
$40,000,000 CJ est. value
Clovis, CA 93619

Lakeshore Stewardship IRSC
Infrastructure
Design
$150,000 CJ est. value
Prather, CA 93651

Lakeshore Stewardship IRSC
Infrastructure
Design
$150,000 CJ est. value
Prather, CA 93651

Burrel Elementary School - Modernization and Additions
Addition, Demolition, New Construction, Renovation, Infrastructure
Bidding
$7,000,000 CJ est. value
Riverdale, CA 93656

Burrel Elementary School - Modernization and Additions
Addition, Demolition, New Construction, Renovation, Infrastructure
Bidding
$7,000,000 CJ est. value
Riverdale, CA 93656

CA NPS PP SEKI 2018(3) CA NPS PP SEKI 2020(1) Pavement Preservation Lassen Seki Phase I and Pavement Preservation Seki Phase II
Term Contract
Post-Bid
Fresno, Sequoia National Park, CA

California Conservation Corps (CCC) Auberry Residential Center - CA Department of General Services
Addition, Demolition, New Construction, Build-out, Infrastructure
Post-Bid
$52,000,000 CJ est. value
Auberry, CA 93602

General Engineering (A License) Construction, San Joaquin, Stanislaus, and Tuolumne Counties, Hetch Hetchy
Infrastructure, Alteration
Results
$5,000,000 est. value
San Joaquin, CA 93660

Remove Concrete Panels and Replace With HMA (Type A)
Infrastructure
Results
$760,000 est. value
CA

The Arthur at Blackstone
New Construction, Infrastructure - 14,000 SF
Construction
$24,000,000 CJ est. value
Fresno, CA 93703

Shields Locan - Clovis Unified School District
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Fresno, CA 93703

Shields Locan - Clovis Unified School District
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Fresno, CA 93703

Pilibos Improvements - PC00185 - City of Fresno
Infrastructure
Conception
$910,200 CJ est. value
Fresno, CA 93727

Divine Mercy Catholic Church
New Construction, Infrastructure - 49,100 SF
Design
$16,000,000 CJ est. value
Clovis, CA 93619

Last Updated 05/25/2023 02:36 PM
Project Title

Muir Elementary Safe Routes

Physical Address View project details and contacts
City, State (County) Fresno, CA 93728   (Fresno County)
Category(s) Education, Heavy and Highway, Sewer and Water
Sub-Category(s) Elementary School, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected November 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,361,632 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 25, 2023, bids received were rejected. Project will rebid but no definite date yet.** The scope of work includes sidewalk, curb and gutter, pavement re-surfacing and reconstruction, concrete drive approaches and alley approaches, storm drain improvements, tree removal, and striping and signage. http://www.fresno.gov/Government/DepartmentDirectory/Finance/Purchasing/AnticipatedFormalBidAwards.htm Click here to visit Anticipated Bid Awards website once the bid closes to find out more about the award Pre-Bid Meeting Yes - Not Mandatory The Construction Allocation for this project is $1,315,000

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents