Similar Projects
TCTC Culinary Arts Kitchen
Renovation, Addition
Conception
$1,000,000 est. value
Warren, OH 44483

BAY Arts - State of Ohio
Renovation
Conception
$500,000 est. value
Bay Village, OH 44140

Z--Construction IDIQ 2020 - Ohio - MEP
Design
$20,000 to $16,000,000 est. value
Chillicothe, Cleveland, OH

Z--Construction IDIQ 2020 - Ohio - MEP
Design
$20,000 to $16,000,000 est. value
Chillicothe, Cleveland, OH

Plumbers for Replacement of Lead Service Lines on Public and Private Property - Child Care Grant
Term Contract
Bidding
$330,000 est. value
Cincinnati, OH

Dorm Renovations - Ohio School for the Deaf
Renovation - 12,966 SF
Bidding
$1,980,000 CJ est. value
Columbus, OH 43214

Plumbing Maintenance for Butler County Correctional Facilities
Term Contract
Sub-Bidding
Hamilton, OH 45011

Plumbing System Replacement BP3 - Wilce Piping Replacement
Renovation
Sub-Bidding
$949,638 CJ est. value
Columbus, OH 43210

Plumbing Repairs
Post-Bid
$1,800,000 est. value
Columbus, OH

Buckeye Hills Career Center Red Building Renovation
Renovation
Post-Bid
Rio Grande, OH

Career Tech Classroom Renovation
Renovation
Results
$245,000 est. value
Dayton, Kettering, OH 45429

Electricity Lab Expansion and Corridor Upgrades Project
Renovation
Results
$740,000 est. value
Nelsonville, OH

Alliance For Working Together - Transformation Training Center
New Construction - 12,462 SF
Construction
$2,500,000 est. value
Mentor, OH 44060

CityLink Center
New Construction, Renovation
Construction
Cincinnati, OH 45214

B I S Superintendent Mansion
Demolition
Pending Verification
Lancaster, OH 43130

Last Updated 08/15/2022 12:07 PM
Project Title

Washington County Career Center Restroom Renovations

Physical Address View project details and contacts
City, State (County) Marietta, OH 45750   (Washington County)
Category(s) Education, Single Trades
Sub-Category(s) Plumbing, Vocational School
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

A. This Section includes the following: 1. Type of the Contract. 2. Use of premises. 3. Owner's occupancy requirements. 4. Work restrictions. 5. Specification formats and conventions. B. Related Sections include the following: 1. Division 1 Section 015000 Temporary Facilities and Controls for limitations and procedures governing temporary use of Owners facilities.

Details

82,080 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents