Similar Projects
Bridge Abutment Foundation Repair
Post-Bid
Lakewood, CO 80228

Grading Erosion and Sediment Control GESC Services
Post-Bid
Lakewood, CO 80227

Removal of Asphalt Mat Ditch Grading, Placement of Topsoil and Seeding
Results
$1,000,000 to $5,000,000 est. value
CO

Drainage Improvements and Repaving of Zang Street and Coal Creek Yards
Results
$1,000,000 to $5,000,000 est. value
CO

Handrail Improvements at Maverick Mesa Park
Infrastructure
Post-Bid
Arvada, CO

Sky Ranch Phase 2 Grading Project
Results
Lakewood, CO 80033

Traffic Calming and Walkability Project
Infrastructure
Post-Bid
Edgewater, CO

Spray Lining 4 Culverts and Constructing a Headwall and Wingwall for One Culvert
Results
Less than $1,000,000 est. value

Detention Ponds Improvement Project
Infrastructure
Post-Bid
$550,000 to $600,000 est. value
Golden, CO

Removing and Replacing All Existing Tunnel Lighting
Results
$5,000,000 to $20,000,000 est. value

2021 Drainage Improvement and Road Repair Project 1
Infrastructure
Post-Bid
Lakewood, CO

Addenbrooke Park Pond Renovations
Results
Lakewood, CO

Bayou Ditch Culvert Replacement
Results
$70,000 to $90,000 est. value
Wheat Ridge, CO 80033

Flood Mitigation and Repair for Monument POE North Bound
Results
Less than $36,000 est. value
Lakewood, CO

Pipe Stockpile Tarp
Results
Arvada, CO 80002

Reported 09/24/2021 12:00 AM
Project Title

Outfall Structures Improvement Project

Physical Address View project details and contacts
City, State (County) CO   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Project has two locations which are both located adjacent to the Johnson Reservoir, Jefferson County, Colorado: (1) northwest corner of the Johnson Reservoir (east of Urban Air Trampoline & Adventure Park) near the Chanson Plaza Shopping Center; and (2) west side of the Johnson Reservoir and north of Concordia On The Lakes Apartments. The scope of work generally includes the following: Remediation to existing two drainage outfall structures: Remove existing grouted riprap protection Install Support system for existing flared end section (FES) Reattached FES Regrade & revegetate existing embankment.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents