Similar Projects
Tru By Hilton
New Construction
Conception
Panama City, FL

Alys Beach Block EE Residential Subdivision
New Construction, Infrastructure
Conception
$8,200,000 CJ est. value
Panama City Beach, FL 32413

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Fairfield Inn & Suites by Marriott / Panama City
New Construction
Design
$20,000,000 est. value
Panama City, FL

Jan Drive and Genevieve Avenue Drainage Improvements
Infrastructure
Bidding
$717,247 CJ est. value
Callaway, FL 32404

Majette Dunes Parking Lot Resurfacing Project
Infrastructure
Bidding
$187,671 CJ est. value
Panama City, FL 32404

New Classroom Building - Merritt Brown Middle School - Bid Packages
New Construction, Infrastructure
Sub-Bidding
$3,000,000 CJ est. value
Panama City, FL 32404

Bay District Schools - New Classroom Building - Tommy Smith Elementary School - Bid Packages
New Construction, Infrastructure
Sub-Bidding
Panama City, FL 32404

Harvest Worship Center - Phase 1, 2 & 3
New Construction, Infrastructure - 19,686 SF
Post-Bid
$3,000,000 CJ est. value
Panama City, FL 32405

Martin Luther King (MLK) Recreation Center / City of Panama City
New Construction, Renovation, Infrastructure
Post-Bid
$14,700,000 CJ est. value
Panama City, FL 32401

Gore Park Site Work
Renovation, Infrastructure
Results
Callaway, FL 32404

Roadway Rehabilitation HM Phase VI (Major Resurfacing - Local Roads)
Infrastructure
Results
$2,651,838 CJ est. value
Panama City, FL 32401

Embassy Suites
New Construction
Construction
$20,000,000 est. value
Panama City Beach, FL

Two-Phase Design and Construction Site Development and Utilities Phases I and II, Tyndall AFB, FL
Infrastructure
Construction
$357,983,153 CJ est. value
Tyndall AFB, FL 32403

Air Force Base Rebuild - Tyndall Air Force Base
Demolition, New Construction, Infrastructure
Pending Verification
$3,000,000,000 CJ est. value
Tyndall AFB, FL 32403

Last Updated 04/01/2023 10:31 PM
Project Title

Extended Stay America / Panama City Beach

Physical Address View project details and contacts
City, State (County) Panama City Beach, FL 32408   (Bay County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Site Development
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $8,000,000 [brand] Estimate
Plans Available from Negotiating General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Project consist of a wood-framed, slab-on-grade national chain hotel with associated site work. *The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder.

Details

4 Stories Above Grade, 53,877 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents