Similar Projects
Justice of the Peace Courts
New Construction
Conception
Midland, TX 79701

Constable Offices
New Construction
Conception
Midland, TX 79701

Design-Build Services for Courthouse Renovations and County Annex Facility
Renovation
Design
$45,000,000 to $55,000,000 est. value
Hempstead, TX

City Hall
New Construction - 36,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Huntsville, TX

RFQ Construction Manager at Risk - Fannin County Justice Center Remodel
New Construction, Infrastructure - 82,500 SF
Bidding
$11,000,000 CJ est. value
Bonham, TX 75418

RFP Construction Manager at Risk - Construction of the New City Hall at 600 South Johnson
New Construction, Infrastructure - 151,250 SF
Bidding
$27,000,000 CJ est. value
Amarillo, TX 79101

Mckinney Municipal Complex
New Construction, Infrastructure - 173,000 SF
Post-Bid
$95,000,000 CJ est. value
McKinney, TX 75069

League City (North County) Annex and Bacliff JP Court Pct. 1 Construction Renovations and Additions
Renovation, Addition - 11,000 SF
Post-Bid
Less than $13,700,000 est. value
Bacliff, League City, TX 77573

Hurricane Harvey Repairs for Jefferson County Subcourthouse
Renovation
Results
Beaumont, TX 77640

City Hall 3rd Floor Build-Out
Build-Out - 1,074 SF
Results
Katy, TX 77493

Courthouse Restoration and Rehabilitation Project
Renovation
Construction
Baird, TX 79504

City Hall First Floor Improvements
Renovation - 5,100 SF
Construction
$1,300,000 est. value
Temple, TX 76501

Court Remodel, Annex 1st Floor
Renovation, Alteration
Pending Verification
$1,345,950 est. value
Killeen, TX

Relocate Public Safety Facility - Police/Fire/Court
Renovation
Pending Verification
$4,500,000 est. value
Port Arthur, TX

City Hall Renovations
Renovation
Conception
$36,100,000 est. value
Richardson, TX

Last Updated 09/23/2022 11:15 AM
Project Title

Municipal Court Building Renovation - City of Copperas Cove

Physical Address View project details and contacts
City, State (County) Copperas Cove, TX 76522   (Coryell County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Municipal Court is in need of a full renovation. The following items will need to be replaced: roof replacement, flooring, office renovations, bathroom renovations, and painting. Renovation cost estimated for 600 sf. single story municipal court house at $78.00 sf. The project is included in the city's 2023-2027 capital improvement plan (CIP). As of September 23, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

1 Story Above Grade, 600 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents