Similar Projects
Rob Jaggers Main Water Line
Design
$200,000 to $400,000 est. value
NM

US Highway 550 Sanitary Sewer Tie-In
Post-Bid
Aztec, NM 87410

Construction Services
Post-Bid
Bernalillo, NM 87004

Advanced Metering Infrastructure
Results
Less than $963,817 est. value
Truth or Consequences, NM 87901

Chamberino Mutual Domestic Water Consumer and Sewer Association Water System Improvements Project
Results
Anthony, NM 88021

Walatowa Timber Industries Waterline Construction
Post-Bid
Jemez Pueblo, NM 87024

2018 Colonias Water System Improvements
Results
$373,870 est. value
Lordsburg, NM 88045

P-Tunnel Waterline Replacement
Post-Bid
Albuquerque, NM 87131

West Cedar Street Sewer Line Relocation
Results
$375,000 to $425,000 est. value
Deming, NM 88030

Jacquez Road Line Extension
Post-Bid
La Mesa, NM 88021

Alto 2 Well (H-1979-S7) Improvements
Results
Ruidoso, NM 88345

2019-2020 Manhole and Valve Adjustments for Overlay Project
Term Contract
Post-Bid
Las Cruces, NM 88001

Hemlock Circle Waterline Replacement Phase II
Results
$430,000 est. value
Ruidoso, NM

Wastewater System Improvements 2019
Post-Bid
Hagerman, NM 88232

Water System Improvements
Results
Less than $1,082,681 est. value
Tularosa, NM

Reported 06/12/2020 12:00 AM
Project Title

Wastewater and Water System Improvements Project

Physical Address View project details and contacts
City, State (County) Cimarron, NM 87714   (Colfax County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes the construction of wastewater system improvements consisting of: replacement/rehabilitation of sewer lines on 11th St. between Collision Ave. and Jefferson Ave (approximately 2,000 LF); replacement of sewer lines in the alley near 8th St Euclid Ave (approximately 1,250 LF); replacement of existing manholes and installation of new manholes (17 EA); reconnections to residences (approximately 62); and other appurtenances. The project also includes water system improvements consisting of replacing approximately 2,150 LF of existing water distribution lines along 11th St. between Collision Ave. and Jefferson Ave, including fire hydrants, valves, and other incidental work identified in a base bid schedule and two (2) additive bid schedules, to complete a project.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents