Similar Projects
The Piazza at Former Star City Site - Master Plan
New Construction - 51,100 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Bridgeville, PA 15017

Monongahela Riverfront for Recreational Use - Master Plan
New Construction
Conception
Pittsburgh, PA 15207

Pittsburgh Penguins Former Arena Site - Entertainment Facility by Live Nation and Parking Garage
New Construction - 40,000 SF
Design
$3,000,000 est. value
Pittsburgh, PA 15219

Lot 10 - North Shore Entertainment Building and Plaza
New Construction
Design
$4,500,000 est. value
Pittsburgh, PA 15212

Memorial Park Expansion Phase 2
Bidding
Yardley, PA 19067

2021 Playground Renovation Project: Barclay Elementary School and Cold Spring Elementary School
Renovation
Bidding
Doylestown, Warrington, PA 18976

South Park Trail Improvement Project
Post-Bid
South Park Township, PA 15129

Great Allegheny Passage - Waterfront Paving
Renovation
Post-Bid
Homestead, PA 15120

Athletic Field Improvements for the Bloomsburg Area School District
Results
Bloomsburg, PA 17815

Park Development Project
Results
$25,000 est. value
Houtzdale, PA 16651

The Highlands at Wyomissing Expansion
Renovation, Addition - 6,000 SF
Construction
Wyomissing, PA 19610

Hazelwood Green Plaza
New Construction - 86,196 SF
Construction
$4,975,000 est. value
Pittsburgh, PA 15207

Kaufmann's Grand on Fifth - Rooftop Ice Skating Rink
New Construction
Conception
Pittsburgh, PA

Frick Park - Phase 2
Renovation
Design
Pittsburgh, PA 15217

Teegarden Park Tennis Court Resurfacing
Bidding
Berwyn, PA 19312

Last Updated 05/14/2021 05:43 AM
Project Title

Fishing Park Improvements Project

Physical Address View project details and contacts
City, State (County) New Brighton, PA 15066   (Beaver County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $135,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Stabilization of the fishing pier support structure via clearing and grubbing vegetation and the use of secured grout bags in the area where rock support has washed out; replacement of the rock rip rap in the eroded area behind the fishing pier – new rip rap shall be grouted in place; installation of a wedge curb along the boat launch drive (river side); installation of a single course, large block retaining wall along the boat launch drive (New Brighton Borough side); clearing and grubbing of vegetation and replacement of stone rip rap (not grouted) in the storm drainage pipe area; and removal and replacement of the asphalt walkway.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents