Similar Projects
Last Updated | 05/23/2023 06:12 PM |
Project Title | EDL Crane Festoon Installation |
Physical Address | View project details and contacts |
City, State (County) | Richland, WA 99352 (Benton County) |
Category(s) | Single Trades |
Sub-Category(s) | Service/Term Contracts |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists of disassembly and removal of existing bridge crane hot rails, collector shoes, and conductors currently providing power to the existing overhead bridge crane, and the installation/mounting of a complete festoon power system (including mounting brackets, C-rail track hangers, C-rail festoon track, festoon flat cable conductors, and connection to the existing overhead crane end-truck junction box). Contractor is responsible for ensuring that the overhead crane is properly electrically connected to the new festoon system, and for providing a "factory certified" representative to witness start up and verify that the overhead crane is fully functional. Contractor shall furnish all the labor, supervision, equipment, materials, and subcontractors necessary as per the Statement of Work, General Requirements, and other attached Contract Documents. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |