Last Updated | 02/16/2024 09:09 AM |
Project Title | Central Prison Door Controls and Hardware Replacement |
Physical Address | View project details and contacts |
City, State (County) | Raleigh, NC 27606 (Wake County) |
Category(s) | Professional Services |
Sub-Category(s) | Architectural, Engineering |
Contracting Method | Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected May 2024 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $10,500,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Central Prison Door Controls and Hardware Replacement This project involves the replacement of selected sliding electrical detention doors throughout the institution. The project also includes installation of one new sliding pneumatic detention door at the medical building. The work includes miscellaneous associated work for welding, cutting, painting, electrical, and other Work as indicated in the Contract Documents. Mandatory Detention Equipment Contractor Statement of Qualifications Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company, insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal, or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the contract in accordance with the bid bond. Said deposit shall be retained by the owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law. A performance bond and a payment bond will be required for one hundred percent (100%) of the contract price. Payment will be made based on ninety-five percent (95%) of monthly estimates and final payment made upon completion and acceptance of work. NOTE: If no new bidders attend the second pre-bid meeting, then the second bid opening will be held at 1:00 pm on 2/27/2024, and no further addenda will be issued. |
||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |