Similar Projects
Springfield Township Multimodal Trail Phase 2
Infrastructure
Conception
Grove City, PA 16127

State Street Pedestrian Improvements
Infrastructure
Design
Hermitage, PA 16148

Completion of an Asphalt Paved Parking Lot, Concrete Curbs and Concrete Sidewalk
Post-Bid
Farrell, PA 16121

Asphalt Surface Treatment
Post-Bid
Mercer, PA

Paving and Sealcoating the District's Parking Lots
Results
$20,000 est. value
Mercer, PA 16137

Hermitage Town Center Pedestrian Improvements
Results
Hermitage, PA 16148

Parking Lot Pavement Restoration Work
Infrastructure
Post-Bid
Hermitage, PA 16148

CDBG Roadway Improvements
Results
Hermitage, PA 16148

Proposed Parking Lot Pavement Restoration Work
Infrastructure
Post-Bid
Hermitage, PA

2021 Street Improvement Project
Results
Sharpsville, PA 16150

Gurrera Village Concrete Sidewalk Replacement
Infrastructure
Post-Bid
Hermitage, PA 16148

South Darby Road Stormwater and Roadway Improvements Project
Results
Hermitage, PA 16148

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

2020 Neighborhood Investment Program
Results
Hermitage, PA

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Last Updated 05/20/2022 07:08 AM
Project Title

Multimodal Phase III Contract

Physical Address View project details and contacts
City, State (County) Sharon, PA   (Mercer County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,300,000 to $1,500,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Asphalt pavement milling/overlay, base repair, joint sealing, pavement markings, sidewalk and ADA ramp construction, and drainage improvements for municipal roadways at various locations within the City of Sharon. Work will also include restoring all disturbed areas to original condition.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents