Similar Projects
Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

FM Elevator Upgrades Study FY22-FY23
New Construction
Bidding
$4,000,000 est. value
Cincinnati, OH 45220

FM Elevator Upgrades Study FY22-FY23
New Construction
Bidding
$4,000,000 est. value
Cincinnati, OH 45220

Design Build For New Fire Training Center
New Construction, Renovation - 30,000 SF
Post-Bid
Cincinnati, OH

Design Build For New Fire Training Center
New Construction, Renovation - 30,000 SF
Post-Bid
Cincinnati, OH

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

CDC/NIOSH Architect Engineer Services
Term Contract
Design

General Environmental Services
Term Contract
Bidding
Cincinnati, OH

Engineering, Planning and Development
Post-Bid

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Architectural Services for LIHTC
Renovation
Bidding
Cincinnati, OH

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

Smale Riverfront Park Design Services
Results
Less than $300,000 est. value
OH

Last Updated 07/20/2022 09:14 AM
Project Title

Design Services for East Hill Avenue Sewer Replacement

Physical Address View project details and contacts
City, State (County) Cincinnati, OH   (Hamilton County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids.
Project Status Accepting Qualifications,
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will replace a badly deteriorated sewer segment and correct a serious hydraulic issue for the sewer on East Hill Avenue. The sewer was installed around 1915 based on the age of other sewers in the area. A secondary benefit to this project, but not the driving force of the project is that it removes a sewer from under three residences and replaces this sewer in the public right of way, allowing for much easier maintenance in the future and reducing MSD's risk from potential property damages. This project will install approximately 340 feet of new 30-inch sewer and approximately 110 feet of new 18-inch sewer to replace and relocate a badly deteriorated 24-inch sewer that cannot be lined and is beyond its useful life. The new sewer will be placed in the public right of way and the existing sewer running underneath the 3 residences will be abandoned. This project is located in the Hyde Park neighborhood of the City of Cincinnati.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents