Similar Projects
Progress Water Association - Plant #4 Well
Infrastructure
Bidding
$100,000 est. value
Purvis, MS

New 400 GPM Water Well
Post-Bid
Foxworth, MS

Contract A Dorothy Street and Depot Street Waterline Replacement and Contract B Industrial Park Well Repairs
Infrastructure
Post-Bid
Charleston, MS 38921

2019 CDBG Glen Well
Results
Corinth, MS

Provide and Install 2 Pumps and Motors
Results
Mississippi City, MS 39762

Grinder Pump Systems Commodity FY22
Infrastructure
Post-Bid
Brandon, MS

2019 Alcorn County CDBG Biggersville Well
Results
MS

Contract "B" Water Well Improvements
Infrastructure
Post-Bid
Charleston, MS

Contract 2 Water Well - Drinking Water System Improvements
Renovation
Results
$885,000 est. value
Lucedale, MS

750 GPM Water Well and Appurtenances
Infrastructure
Post-Bid
Raleigh, MS

Test Holes and Test Wells mTrade Park
Infrastructure
Results
$264,000 est. value
Oxford, MS 38655

Drilling and Constructing a Gravel Wall Water Well
Infrastructure
Post-Bid
Roxie, MS

Drain Maintenance Services, G.V. "Sonny" Montgomery VA Medical Center, Facilities Management Service Jackson, MS 39216
Term Contract
Results
Jackson, MS 39216

12" Hydraulic Storm Water Pumping System
Infrastructure
Post-Bid
Starkville, MS

Remove the Existing Gas and Diesel Pumps
Term Contract
Results
Pascagoula, MS 39568

Last Updated 05/02/2022 11:10 AM
Project Title

Replace Geothermal Heat Pumps at Corinth

Physical Address View project details and contacts
City, State (County) State-Wide: MS
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $520,000 to $535,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace (9) nine geothermal water-cooled heat pumps with electric rooftop and split system air cooled electric heat pumps. Water source heat pumps are sized from 3.5 ton to 12 ton. New air-cooled heat pumps will meet the same tonnage as existing. To install these rooftop and split system mounted units, most of the units will have to be fitted with new ductwork and electrical wiring to connect to existing components. The roof will also have to be modified with holes cut for ductwork and unit placement. The existing geothermal system will be drained, removed, and certain components such as the drilled wells abandoned. The heat pumps are located in mezzanine type areas and are extremely hard to access, even for preventative maintenance functions, therefore adding to the cost of removing due to having to disassemble through an open roof hatch. Carrier, Trane, or equivalent brands shall be installed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents