Similar Projects
Last Updated | 05/02/2022 11:10 AM |
Project Title | Replace Geothermal Heat Pumps at Corinth |
Physical Address | View project details and contacts |
City, State (County) | State-Wide: MS |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $520,000 to $535,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replace (9) nine geothermal water-cooled heat pumps with electric rooftop and split system air cooled electric heat pumps. Water source heat pumps are sized from 3.5 ton to 12 ton. New air-cooled heat pumps will meet the same tonnage as existing. To install these rooftop and split system mounted units, most of the units will have to be fitted with new ductwork and electrical wiring to connect to existing components. The roof will also have to be modified with holes cut for ductwork and unit placement. The existing geothermal system will be drained, removed, and certain components such as the drilled wells abandoned. The heat pumps are located in mezzanine type areas and are extremely hard to access, even for preventative maintenance functions, therefore adding to the cost of removing due to having to disassemble through an open roof hatch. Carrier, Trane, or equivalent brands shall be installed. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |