Similar Projects
Design/Build Services HVAC System Bldg 1326, Eglin AFB
Design
$1,000,000 to $5,000,000 est. value
Eglin AFB, FL

Repair HVAC, 705 TRS Building 90067
Renovation, Infrastructure
Design
$500,000 est. value
Hurlburt Field, FL

HVAC and Mechanical Products
Term Contract
Post-Bid

Hangar 90029 Fan Procurement and Installation
Term Contract
Post-Bid
Hurlburt Field, FL 32544

HVAC Maintenance and Repair Services
Results
Fort Walton Beach, FL

Rooftop Unit (RTU) Replacement
Results

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

B1326 HVAC Design Build, Eglin AFB
Term Contract
Results
$1,000,000 to $5,000,000 est. value
Eglin AFB, FL 32542

Eglin AFB - Install Humidity Control FMS Pods at Bldg 1416
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value
Eglin AFB, FL

HVAC Equipment Maintenance, Repair, Installation, and Replace Services-Various Locations North Region
Alteration
Results

65th SOS HVAC Expansion
Term Contract
Post-Bid
Hurlburt Field, FL

Corrosion Control Facility Industrial Environmental Control and Filtration System Maintenance
Infrastructure
Results
Eglin AFB, FL

UTC Warehouse HVAC
Alteration
Post-Bid
Hurlburt Field, FL

HVAC Service for Tenant Units
Term Contract
Post-Bid
Eglin AFB, FL

Hurlburt Field Hood and Duct Cleaning
Term Contract
Post-Bid
Hurlburt Field, FL

Last Updated 07/14/2022 02:51 AM
Project Title

Replace and Improve HVAC System in Bldg 12722

Physical Address View project details and contacts
City, State (County) Eglin AFB, FL   (Okaloosa County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes, but is not limited to the following, to replace entire HVAC system at Building 12722. Also, providing upgraded controls, multi-zone air handlers, boiler, and chillers to replace existing system at Test Site A-20. This project shall deliver a complete and usable facility and or systems. The project will comply with applicable DOD, Air Force, and base design rules and standards. The performance period is anticipated to be 426 days after the Notice to Proceed (NTP). The above general description of work does not in any way limit the responsibility of the contractor to perform all work and furnish all labor, materials, and equipment in accordance with the specifications.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents