Similar Projects
Duct Bank Repairs
Alteration
Bidding
$5,000,000 est. value
Boston, MA

77 Webster Ave. Renovations - General Bids
Alteration
Bidding
Chelsea, MA 02150

Remote Headworks Shaft Access Improvements - Sub-Bids
Alteration
Sub-Bidding
$1,914,000 est. value
Boston, MA 02127

Furnish and Install Prefabricated Steel Frame and Metals Panel Shed - Sub Bid
Alteration
Sub-Bidding
$253,000 est. value
East Boston, MA

500KW Trailer Mounted Generator
Post-Bid
Boston, MA 02129

MBTA South Boston Power Complex Transformers
Post-Bid
$2,000,000 est. value
Boston, MA 02116

Landside Vehicle Charging Stations Logan International Airport
Results
Less than $1,840,000 est. value
Boston, MA

Generator Repair and Retrofitting
Results
Boston, MA 02129

Auditorium Lighting Packages
Alteration
Bidding
Roxbury, MA

Elevator Controls Replacement - Filed Sub Bids
Alteration
Sub-Bidding
$2,987,012 est. value
Boston, MA 02114

Remove and Replace the UPS at 45 High Street
Post-Bid
Less than $330,000 est. value
Boston, MA

Family Justice Center Elevator Modernization Project - Filed Sub-Bids
Results
$499,000 est. value
Boston, MA 02215

MOD-3 Digester Uplighting at the Deer Island Treatment Plant
Alteration
Bidding
Boston, MA

77 Webster Avenue Renovations - Sub-Bidding
Infrastructure, Alteration
Sub-Bidding
Chelsea, MA 02150

SLE - Bracket Arms for Flood Lights
Post-Bid
Boston, MA

Reported 03/23/2022 12:00 AM
Project Title

J030--Generator Preventive and Corrective Maintenance

Physical Address View project details and contacts
City, State (County) Boston, West Roxbury, MA 02132   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall provide all resources required in performing these maintenance services and inspections to include (but not limited to) all parts, materials, lubricants, fluids, filters, equipment, tools, shipping, travel, and labor. Contractor shall be responsible to determine the nature and extent of any work required and to restore equipment to satisfactory condition and operation, as determined by VA, replacing parts as necessary.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents