Similar Projects
Upgrade to Campus Fire System - Phase 1 and 2
Alteration
Bidding
Pueblo, CO 81001

Urban Tree Inventory and Evaluation
Term Contract
Bidding
Colorado Springs, CO

Wheat Ridge - Updated Fire Detection & Monitoring Systems
Post-Bid
$1,400,000 est. value
Wheat Ridge, CO 80033

SB 267 Improve Fire Sprinkler Alarm System DTS
Post-Bid
$500,000 to $650,000 est. value
Colorado Springs, CO 80906

Fire Alarm Testing, Service and Repair
Term Contract
Results
Brighton, CO 80601

Fire Alarm Panel Upgrade
Results
Brighton, CO 80601

Fire Sprinkler and Exhaust Hood Inspection
Term Contract
Post-Bid
Golden, CO 80401

Fire Alarm System Upgrade - Virginia Village Branch Library
Results
Glendale, CO 80222

Grant Beacon Fire Sprinkler
Post-Bid
Denver, CO 80223

J012--Fike Fire Suppression System Maintenance Base +4Oy - 554
Results
Aurora, CO 80045

PP6509 Sandoval ES Fire Alarm and Detection System Replacement
Post-Bid
Denver, CO 80223

Centennial Building Fire Alarm and Fire Suppression Replacement Project
Results
Less than $2,600,000 est. value
Denver, CO 80203

Platte Garage Dry Pipe Fire Sprinkler Replacement
Post-Bid
Denver, CO

Fire Alarm Replacement Projects (Lesher and Werner)
Results
Fort Collins, CO 80524

Replace Fire Suppression Valve- GYC
Post-Bid
Denver, CO 80205

Last Updated 08/31/2021 12:55 PM
Project Title

Fire Suppression Sprinkler System - The Loveland Safehouse

Physical Address View project details and contacts
City, State (County) Loveland, CO 80537   (Larimer County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method
Project Status Permitting, Construction Start Expected November 2021, Construction Completion Expected November 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Alternatives to Violence, Inc. (ATV) a 501 c(3) non-profit organization, in Loveland, Colorado, will accept bids for installation of a “Modified NFPA 13D” fire suppression sprinkler system. The project will be funded through City of Loveland Community Block Development Grant (CDBG) funds. The Loveland Fire Rescue Authority has approved this system for the building stating requirements of a permanent water tank and small pump, which activates if a sprinkler is discharged and will supply 15 minutes of water.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents