Similar Projects
Elson Street Culvert Replacement
Post-Bid
Kirksville, MO

Corby Pond Restoration
Post-Bid
Saint Joseph, MO 64506

Forest Park Waterway Project
Post-Bid
$7,102,880 est. value
Saint Louis, MO 63110

Deer Creek Flood Mitigation Phase 2
Post-Bid
Brentwood, MO

West Hangar Drainage Improvements
Bidding
Chesterfield, MO 63005

Paddock Creek Improved Channel Repair
Bidding
$597,000 est. value
Chesterfield, MO

Harrison County Courthouse Landscape and Drainage Improvements
Post-Bid
MO

Harrison County Courthouse Landscape and Drainage Improvements
Post-Bid
Bethany, MO 64424

Clean and Shape Ditches
Alteration
Bidding
Martinsburg, MO

Elementary Library Drainage
Infrastructure
Post-Bid
Iberia, MO

Goose Creek Road Box Culvert Replacement
Alteration
Bidding
MO

Woodbine Road Culvert Replacement
Infrastructure
Bidding
Saint Joseph, MO

Romaine Creek Road - Slope Repair
Infrastructure
Bidding
$300,024 est. value
Hillsboro, MO

Sidewalk and Drainage Improvements
Infrastructure
Bidding
Saint Charles, MO

Paxton Keeley Elementary Playground Drainage
Infrastructure
Bidding
Columbia, MO 65203

Last Updated 05/18/2021 03:15 AM
Project Title

Metal Pipe (CMP and Arch Pipe)

Physical Address View project details and contacts
City, State (County) MO   (Warren County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents