Similar Projects
Pedestrian Signal Crosswalk Project
Infrastructure
Bidding
Bear Creek Village, PA

Concrete ADA Ramps CDBG Project
Infrastructure
Bidding
Wyoming, PA

154-160 Main Street Parking Lot Project
Post-Bid
Dallas, PA 18612

North Franklin Street (West Jackson Street to West North Street) and West North Street (North Franklin Street to Luzerne County Parking Lot) Streetscape Project
Infrastructure
Post-Bid
Wilkes-Barre, PA 18702

Selective Concrete Sidewalk and Bituminous Repair Project at Exeter Gardens I # 57-3 and Exeter Gardens II # 57-10
Results
Exeter, PA 18643

Construction of the Panama Street CDBG Sewer and Roadway Improvements
Results
$770,000 est. value
Pittston, PA 18640

Parking Lot Renovations Including Paving and Sidewalk Restoration
Infrastructure
Post-Bid
Glen Lyon, Kingston, Shickshinny, Swoyersville, PA 18655

Fine Grading and Paving of the Trailwood Parking Lot
Results
$45,000 est. value
Bear Creek Village, PA 18702

Parking Lot Renovation for Horizon Village
Infrastructure
Post-Bid
Mountain Top, PA 18707

Penn Lake Park Improvements CDBG Removal of Architectural Barriers
Results
Penn Lake Park, PA

Construction of a Driveway from Church Street to the Existing Municipal Parking Lot
Infrastructure, Alteration
Post-Bid
Plymouth, PA 18651

Nescopeck ADA Ramp and Access Tunnel
Results
Nescopeck, PA 18635

Downtown Improvements Project - Contract No. 1 Civil Construction
Infrastructure
Post-Bid
Dallas, PA

Early Learning Center Parking Lot Improvements
Infrastructure
Results
Hazle Township, PA

Milling and Paving of Italy Street
Infrastructure
Post-Bid
Mocanaqua, PA

Reported 02/09/2022 12:00 AM
Project Title

OCD Borough Building ADA Ramp Project

Physical Address View project details and contacts
City, State (County) Dupont, PA 18641   (Luzerne County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

OCD Borough Building ADA Ramp Project: Base Bid; New ADA Ramp, Door Replacement, Bituminous Paving, Concrete Curb and Sidewalk.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 08 - Openings, Doors and Frames, Windows.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents