Similar Projects
Sidewalk Improvements on 13th Avenue (Lamar Street West) and Wadsworth Boulevard (Mansfield Avenue South)
Post-Bid
Lakewood, CO 80226

Improvements of Walkways, Curbs, Trails and Parking Lots at Five Parks
Post-Bid
Evergreen, CO 80439

Union and 6th Avenue On-Ramp Median Reconstruction
Results
Lakewood, CO 80226

West 50th Avenue Sidewalk (SRTS) Between Fairmount Elementary & Mcintyre Street
Results
Golden, CO 80419

Climbing Access Trail Construction
Post-Bid
CO

Open Space North 40 Parking Lot Asphalt Replacement
Term Contract
Results
Less than $50,000 est. value
Golden, CO 80401

Standley Lake High School Renovation and Addition
Renovation, Addition
Post-Bid
$5,000,000 to $6,000,000 est. value
Westminster, CO 80021

2020 Safe Routes to School - Pierce Street Project
Results
$300,000 to $350,000 est. value
Edgewater, CO 80214

Green Gables Elementary School Site Path
Infrastructure
Post-Bid
Lakewood, CO 80227

Ada Curb Ramp Upgrades
Results
$1,000,000 to $5,000,000 est. value

Replace Curb Ramps in Region 1
Results
$1,000,000 to $5,000,000 est. value

2021 Concrete Rehab-Ada Improvements
Results
$200,000 to $250,000 est. value
Wheat Ridge, CO

Sidewalk Elevation Differential Mitigation (Sawing)
Results
Lakewood, CO

Parking Lot Expansion
Results
Less than $45,000 est. value
Lakewood, CO 80227

Sidewalk Improvements On Independence Street - 6th Avenue to Lakewood High School
Alteration
Results
Less than $348,004 est. value
Lakewood, CO 80215

Reported 10/22/2021 12:00 AM
Project Title

Elk Meadow Park Stagecoach Trailhead Improvements

Physical Address View project details and contacts
City, State (County) Evergreen, CO 80439   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project scope includes development of schematic designs, full construction documents needed for permitting and construction, permitting at the federal, state, and local level, and ultimately construction of the Trailhead improvements. These improvement s will generally include a redesigned and larger parking lot off Stagecoach Boulevard, a new restroom, full closure and restoration of the south parking area, an at - grade pedestrian crossing of Stagecoach Boulevard, and visitor amenities such as shelters, picnic areas, and ancillary infrastructure.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents